McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Section 01 11 00 SUMMARY OF WORK <br /> 1.02 SUBMITTALS <br /> A. Prior to mobilization the following submittals shall be submitted to the Owner for <br /> review and approval. <br /> 1. Contractor's SPCC Plan, see Section 01 50 00. <br /> 2. Health and Safety Plan (specific to this project), see Section 01 35 29. 1 <br /> 3. Work Plan, see Section 01 32 11. <br /> 4. Construction Schedule, see Section 01 32 16. 1 <br /> B. Prior to construction, the following submittals must be submitted to the Owner for <br /> review and approval. Other submittals may be required and are listed in other <br /> sections of these specifications. <br /> 1. Subcontractors List. <br /> 2. Schedule of Values, see Section 01 29 73. 1 <br /> 3. Other submittals per Section 01 33 00. <br /> 1.03 CONTRACTOR'S USE OF SITE AND PREMISES 1 <br /> A. The Contractor shall assume full responsibility for protection and safekeeping of <br /> products under this Contract. I <br /> B. The Contractor shall obtain and pay for use of any additional parking, storage or <br /> work areas needed for his/her operations. I <br /> C. The Contractor shall limit the construction activities to the areas indicated on the <br /> Drawings. I <br /> D. Work Plan: Before mobilization, submit a Work Plan as specified in <br /> Section 01 32 11. The Work Plan must show use of the project site, proposed <br /> laydown areas, schedule of shutdowns for acceptance by the Owner, and other <br /> requirements as outlined in Section 01 32 11. After acceptance of the plan, <br /> construction operations shall comply with the accepted plan unless deviations <br /> are accepted by the Owner in writing. I <br /> 1.04 WORK HOURS <br /> A. Contractor will be required to provide a project schedule that clearly defines each r <br /> phase of work and the work hours associated with each phase in accordance <br /> with Section 01 32 16. <br /> B. The Work site is available from 06:00 -17:30 during the work week (M-F) <br /> excluding City observed holidays unless otherwise approved by the Owner's <br /> Project Manager. Any additional or alternate work hours will require advance <br /> approval and coordination with the Owner's Project Manager. <br /> I <br /> City of Everett 01 11 00-2 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />