McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 01 22 20 MEASUREMENT AND PAYMENT <br /> The lump sum also includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments, materials, and other equipment <br /> necessary for obtaining the "as constructed" location and elevations of the <br /> Work, in particular pipe invert elevations and other information necessary for <br /> production of the Record Drawing (As-Constructed) documents meeting the <br /> requirements defined in Section 01 79 39. <br /> Costs for providing a professional surveyor licensed in Washington State to <br /> perform the Work and stamp and sign survey documents are included in this <br /> I bid item. <br /> Bid Item 3. Work Plan <br /> The lump sum (LS) Contract Price for"Work Plan" includes all costs <br /> associated with preparing the Work Plan as specified in Section 01 32 11. <br /> Bid Item 4. SPCC Plan <br /> 1 The lump sum (LS) Contract Price for"SPCC Plan" includes all costs <br /> associated with creating and updating the accepted SPCC (Spill Prevention, <br /> Control, and Countermeasures) Plan, and all costs associated with the setup <br /> of prevention measures and for implementing the Plan as specified in <br /> WSDOT Standard Specifications Section 1-07.15(1). <br /> Bid Item 5. Construction Progress Schedule <br /> The lump sum (LS) Contract Price Bid for"Construction Progress Schedule" <br /> shall be full compensation for compliance with the requirements identified in <br /> Section 01 32 16. <br /> This lump sum price also includes maintaining and updating the schedule as <br /> construction dictates. All revised schedules shall be submitted to the Owner. <br /> Bid Item 6. Temporary Erosion and Sediment Control <br /> The lump sum (LS) Contract Price for"Temporary Erosion and Sediment <br /> Control" shall constitute full compensation for all Work, labor, materials, tools, <br /> and equipment necessary and incidental for the installation, maintenance and <br /> removal of the temporary erosion and sedimentation control (TESC)facilities <br /> to prevent pollution, erosion, siltation, and damage to any wetland, stream, <br /> other watercourse, or surrounding property throughout the life of the Contract. <br /> 111 TESC facilities shall include, but not be limited to, any cover measures, runoff <br /> control measures, soil and site stabilization measures, filter fabric fencing as <br /> shown on the Drawings, and inlet protection measures for the work area and <br /> downstream areas, per City Standard Plans 210 and 214. <br /> The TESC measures shall limit the erosion possibility by covering disturbed <br /> soils, preventing sloughing or raveling of cut and natural slopes, and <br /> controlling surface runoff from flowing into excavations using measures such <br /> as curbs, berms, dikes, and other approved measures. Filter fabric fence <br /> shall be used to treat small areas of non-concentrated runoff prior to <br /> discharge from the site. <br /> Bid Item 7. Trench Excavation Safety Systems <br /> The lump sum (LS) Contract Price for"Trench Excavation Safety Systems" <br /> includes the costs of all the Work, labor, tools, materials, equipment and <br /> incidentals, required to select, construct, maintain, and remove trench safety <br /> City of Everett 01 22 20-7 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> I <br />