I <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> placing and compacting sand bedding and suitable native backfill material, <br /> furnishing and installing conduit and fittings, connecting ends of new conduit <br /> runs to existing conduits with couplings, warning tape, furnishing new wire <br /> and cables, and pulling and terminating new wires and cables. <br /> Bid Item 11. Groundwater Control <br /> The lump sum (LS) Contract Price for"Groundwater Control" shall be full <br /> compensation for costs of all Work, labor, tools, materials, equipment, and <br /> incidentals necessary to size, design, implement, operate, and remove a <br /> groundwater control system as identified in the Contract Documents, <br /> specifically Section 31 23 19, and as necessary for construction. <br /> Bid Item 12. Bypass Pumping <br /> The lump sum (LS) Contract Price for"Bypass Pumping" shall be full <br /> compensation for costs of all Work, labor, tools, materials, equipment, and <br /> incidentals necessary to size, design, implement, operate, and remove a <br /> bypass pumping system as identified in the Contract Documents, specifically <br /> Section 01 50 00, and as necessary for construction. <br /> Bid Item 13. Removal of Unsuitable Material <br /> Measurement will only be made for materials removed at a depth of 6 inches <br /> or greater below the typical pipe trench bottom (lower limit of pipe zone) and <br /> below the aggregate base material for structures. The quantities of authorized <br /> unsuitable material excavation paid for by the Owner shall be computed from <br /> in-place, field measurements and estimates made by the Owner or Engineer. <br /> The unit Contract Price per cubic yard (CY) for"Removal of Unsuitable <br /> Material" shall constitute full compensation for all costs of the Work, labor, <br /> materials, tools, equipment, and incidentals necessary to remove unsuitable <br /> foundation material within excavations for pipelines and structures. The unit <br /> contract price includes excavating, loading, hauling, temporary stockpiling, <br /> and properly disposing off site of unsuitable material from the trench bottom. <br /> For the purpose of establishing a common basis for evaluating bids, an <br /> arbitrary quantity has been shown on the bid form and does not necessarily <br /> represent the quantity, if any, of"Removal of Unsuitable Material"that may be <br /> necessary for project work. Actual quantities will be determined in the field as <br /> work progresses. Removal of unsuitable material work shall only be <br /> conducted with approval from the Owner. <br /> Furnishing imported replacement backfill material, Foundation Material Class <br /> A, from a Contractor-supplied source will be paid for under the Bid Item <br /> "Foundation Material, Class A". <br /> Bid Item 14. Foundation Material, Class A <br /> Measurement for Foundation Material, Class A shall be by the ton, recorded <br /> on certified weight tickets, and placed within the limits of dimensions defined <br /> in the Work, descriptions for other bid items, shown or specified in the <br /> Contract Documents, in accordance with City of Everett Standard Drawings, <br /> or as otherwise approved by the Owner. <br /> 1 <br /> City of Everett 01 22 20-9 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP374 7-3 <br /> I <br />