My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> The unit Contract Price per ton (TN) for"Foundation Material, Class A" shall <br /> constitute full compensation for all Work, labor, tools, materials, and <br /> equipment required to furnish, place, and compact foundation material as <br /> specified in the Specifications and shown on the Drawings. <br /> The costs for over-excavation, removal, haul, and disposal of unsuitable <br /> subgrade material below the pipe zone, is included under the Bid Item <br /> "Removal of Unsuitable Material". <br /> Bid Item 15. Crushed Surfacing Base Course <br /> Measurement for crushed surfacing base course will be by the ton as 1 <br /> recorded on certified weight tickets and limited to dimensions defined in the <br /> Work, descriptions for other bid items, shown or specified in the Contract <br /> Documents, in accordance with City of Everett Standard Drawings, or as I <br /> otherwise approved by the Owner. Crushed Surfacing Base Course material <br /> placed exceeding "neatline" quantities without advance authorization by the <br /> Owner will not be paid. <br /> Measurement for crushed surfacing base course shall be limited to maximum <br /> trench widths defined in the work descriptions for other bid items and as <br /> shown or specified in the Contract Documents. 1 <br /> The unit Contract Price per (TN for"Crushed Surfacing Base Course" shall be <br /> full compensation for all Work, labor, material, tools, and equipment <br /> necessary to furnish, haul, stockpile, place, grade, and compact imported <br /> crushed surfacing base course for pipe bedding, precast junction vault <br /> subgrade, at top of excavations for pavement restoration subgrade, and as <br /> specified in the Specifications and shown on the Drawings. <br /> The unit price for crushed surfacing base course also includes all costs for <br /> controlling moisture content. This includes the cost of sprinkling during dry <br /> periods prior to placement of the crushed surfacing and while spreading and <br /> compacting the material. <br /> Also included in this bid item shall be the cost of all Work required to compact <br /> native subgrade soils, as well as to uniformly spread and compact the I <br /> crushed surfacing material. <br /> Bid Item 16. Gravel Borrow <br /> Measurement for Gravel Borrow shall be by the ton, recorded on certified <br /> weight tickets, and placed within the limits of dimensions defined in the Work, <br /> descriptions for other bid items, shown or specified in the Contract <br /> Documents, in accordance with City of Everett Standard Drawings, or as <br /> otherwise approved by the Owner. <br /> Measurement for gravel borrow shall be limited to maximum trench widths <br /> defined in the work descriptions for other bid items and as shown or specified <br /> in the Contract Documents. <br /> The unit Contract Price per TN for"Gravel Borrow", based on certified weight <br /> tickets, shall be full compensation for all Work, labor, material, tools and <br /> equipment necessary to furnish imported gravel borrow where it is <br /> determined native soils are not suitable for backfill of pipeline trenches, <br /> around the precast junction vault, and as specified in the Specifications and <br /> shown on the Drawings. It is anticipated that none of the native material will <br /> City of Everett 01 22 20-10 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.