McClure and Sons Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
McClure and Sons Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 1:20:31 PM
Creation date
5/19/2023 1:10:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
5/18/2023
Council Approval Date
4/12/2023
Department
Senior Center
Department Project Manager
John Nottingham
Subject / Project Title
WPCF TFI Bar Screen Upgrades
Public Works WO Number
UP3770
Tracking Number
0003685
Total Compensation
$2,275,712.49
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> 2. All required potholing to verify locations of other utilities in or near the <br /> trench lines. <br /> 3. Trench excavation; hauling and proper disposal of excess and <br /> unsuitable excavated native materials; hand digging as necessary; <br /> installation of pipe, fittings, couplings, flexible connectors, and <br /> polyethylene wrap (for ductile iron pipe); pressure testing; placing and <br /> compacting suitable native material; and grading the backfilled <br /> surface to match existing grade. No extra payment shall be made for <br /> removing, loading, hauling, and disposing of displaced and unsuitable <br /> material. The cost of furnishing, placing, and compacting pipe bedding <br /> and imported trench backfill are included under Bid Items for"Crushed <br /> Surfacing Base Course" and "Gravel Borrow". <br /> 4. Connecting the bypass pipeline to Diversion Structure 2 and the new <br /> precast junction vault. <br /> 5. Steel sheeting for covering open excavations left overnight to protect <br /> Owner staff from injury and property damage. <br /> 6. Protection, restoration, and repair of existing utilities, structures, <br /> equipment, and features that are to remain. , <br /> 7. Ethafoam pads or sand backfill, as necessary, to maintain separation <br /> between the 36-inch bypass pipeline and other pipes. <br /> 8. Extra depth, including excavation, backfill and compaction required to <br /> clear known buried utilities or other known obstacles. <br /> 9. Furnishing and installing warning tape over the 36-inch bypass pipe. <br /> Work required to avoid unexpected or unforeseen utilities shall be paid for <br /> under the Bid Item "Resolution of Utility Conflicts. The costs for potholing and <br /> excavation required to determine exact depths and locations of other utilities <br /> shall be included with this Work with no direct compensation made. <br /> Bid Item 19. 10-inch Tank Drain Pipeline <br /> Per linear foot measurement shall be based on the slope distance from point I <br /> to point. The point of beginning or ending of measurement in any particular <br /> run of pipe shall be the vertical intersection of the centerline of the pipe <br /> measured with the centerline of the intersection pipe, or with the beginning or <br /> ending of any new linear length of couplings contained within the measured <br /> length. <br /> The unit Contract Price per LF for "10-inch Tank Drain Pipeline", shall I <br /> constitute full compensation for all Work, labor, materials, tools, and <br /> equipment necessary to furnish and install the pipe as shown on the <br /> Drawings and as required by the Specifications, including all fittings and I <br /> appurtenances (e.g., couplings) required for a complete installation of the <br /> pipe as shown on the Drawings and specified herein, and additionally, shall <br /> include, but not be limited to, the following: <br /> 1. Removal of obstructions not specifically covered under other Bid <br /> Items. This shall include, but not be limited to, removal and disposal of <br /> the existing asphalt concrete pavement, sidewalk, curb, thrust blocks, <br /> miscellaneous landscaping, and sod to facilitate installation as shown <br /> on the Drawings. <br /> City of Everett 01 22 20-12 February 2023 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 <br /> I <br />