Laserfiche WebLink
I <br /> Section 00 21 13 INSTRUCTIONS TO BIDDERS <br /> Any failure of the Bidder to take the actions described and acknowledged in this clause shall <br /> not relieve the Bidder from responsibility for estimating properly the difficulty and cost of <br /> successfully performing the Work, or from proceeding to successfully perform the Work <br /> without additional expense to the City. <br /> The Bidder agrees that the City shall not be liable to it on any claim for additional payment <br /> or additional time or any claim whatsoever if the claim directly or indirectly results from the I <br /> Bidder's failure to investigate and familiarize itself sufficiently with the conditions under <br /> which the Contract is to be performed. <br /> The Bidder shall be familiar and comply with all Federal, State, tribal, and local laws, r' <br /> ordinances, and regulations which might affect those engaged in the Work. The City will not <br /> consider any plea of misunderstanding or ignorance of such requirements. <br /> Bid prices shall include everything necessary for the completion of the Work including, but <br /> not limited to, providing the materials, equipment, tools, plant and other facilities, and the <br /> management, superintendence, labor, and all necessary testing services. <br /> Prospective Bidders are advised that projects with Work on or adjacent to water may require <br /> insurance coverage in compliance with: <br /> 1. The Longshoremen's and Harbor Worker's Compensation Act (administered by U.S. <br /> Department of Labor), or <br /> 2. The State Industrial Insurance (administrated by the Washington State Department <br /> of Labor and Industries), or <br /> 3. Both. <br /> The Contractor shall bear all cost for such insurance as provided in the Contract <br /> Documents. <br /> No Claim shall be allowed because of any ambiguity in the Contract if: I <br /> 1. The Bidder discovers an ambiguity but fails to notify the City, or <br /> 2. The Bidder failed to discover a patent ambiguity that would be discovered by a <br /> reasonably prudent contractor in preparing its Bid. <br /> Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, shall I <br /> request the explanation or interpretation in writing by close of business seven business days <br /> preceding the Bid opening to allow a written reply to reach all prospective Bidders before the <br /> submission of their Bids. <br /> Bidder acknowledges that the Bidder has not relied on representation or warranty of the City <br /> not expressly included in the Contract Documents. I <br /> The information provided by the City is not intended to be a substitute for, or a supplement <br /> to, the independent verification by the Bidder to the extent such independent investigation of <br /> the Drawings and Specifications or Site conditions is deemed necessary or desirable by the <br /> Bidder. Bidder acknowledges that they have not relied upon City or Engineer furnished <br /> information regarding site conditions in preparing and submitting a Bid. <br /> City of Everett 00 21 13-4 February 2023 <br /> WPCF TFI Bar Screen Upgrades <br /> UP3770 <br /> I <br />