Laserfiche WebLink
• • <br /> • <br /> ILI <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> August 13, 2020 <br /> Mr. Jose Bazan <br /> Bazan Architects <br /> 2000 116th Avenue NE <br /> Bellevue, WA 98004 <br /> Email Address: josebazan@bazanarchitects.com <br /> RE: Owner: Sea-Mar Community Health Center <br /> Job Address: 1920 100th Street SE <br /> Plan Check Number: B2004-019, Second Building Review <br /> Dear Mr. Bazan, <br /> We have reviewed the responses to the First Review letter dated May 21, 2020. Multiple comments <br /> have not been completely addressed and require additional action before a permit can be issued. <br /> Additional comments have been added based on a review of the revised construction drawings. <br /> These comments address building issues only. The comments are itemized for consistency with the <br /> original review letter. Additional revisions or additions may be required by other departments <br /> including Public Works, Planning, and Fire. <br /> Code citations provided in the following comments reference the 2015 International Building Code <br /> (IBC), the 2015 International Existing Building Code (IEBC), the 2015 International Property <br /> Maintenance Code (IPMC), the 2015 International Fire Code (IFC), the 2015 International <br /> Mechanical Code (IMC), and the 2015 International Energy Conservation (IECC), and the 2015 <br /> Washington State Energy Code (WSEC). The current IBC referenced standard for accessible design <br /> is the 2009"Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal ADA, FHA, <br /> and HUD regulations and standards, including the Fair Housing Accessibility Guidelines, may be <br /> more restrictive. References to other design standards include the current edition. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> Page 1 of 3 <br />