My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCRA Inc. 5/11/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BCRA Inc. 5/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:49:20 AM
Creation date
6/6/2023 10:53:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BCRA Inc.
Approval Date
5/11/2023
End Date
12/31/2026
Department
Parks
Department Project Manager
Lolly Huggins
Subject / Project Title
Parks Restrooms Renovation Project
Tracking Number
0003723
Total Compensation
$197,060.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
BCRA Inc 10/27/2023 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 13 <br />(Form Approved by City Attorney’s Office November 1, 2009) <br />8. Provide drawings and assist cost estimator for cost estimates. <br /> <br /> <br />Task A4 – Architecture - Howarth Park, 1127 Olympic Blvd <br /> <br />Develop the schematic building design (SD) to follow codes, Client’s goals and establish design concept. The <br />following activities will be performed: <br /> <br />1. Prepare one (1) layout showing ADA compliant family-style restrooms within the existing building <br /> footprint to determine feasibility of renovation. <br /> <br />2. Prepare one (1) layout showing ADA compliant prefabricated concrete restrooms set in a location and <br /> configuration similar to the site/grading plan dated 10-12-2022. <br /> <br />3. Provide drawings and assist cost estimator for cost estimates. <br /> <br />Meetings: <br />• One all team kick off meeting. <br />• 2 team coordination meetings. Assumptions: <br />• Duration for this phase will be 4 weeks. <br />• Client will provide comment and/ or approval within 5 business days of ongoing receipt of deliverable; this <br /> is necessary to keep project on schedule. <br /> <br />Deliverables: <br />• Project management plan <br />• Progress reports <br />• Meeting agenda and notes <br />• Schematic Design Drawings (PDF and CAD format) <br /> <br /> <br />Phase 10 – Schematic Design <br />Task XM1 – MEP - Legion Park, 145 Alverson Blvd <br />Task XM2 – MEP - TA Sullivan Park, 11405 Silver Lake Rd <br />Task XM3 – MEP - Forest Park, 802 E. Mukilteo Blvd <br /> <br />Design West Engineering will provide the following services for Mechanical, Electrical and Plumbing Engineering <br />for this phase: <br /> <br />1. Coordination with Architect on 2 layouts of the restrooms at these locations. <br /> <br />Task XM4 – MEP - Howarth Park, 1127 Olympic Blvd <br /> <br />Design West Engineering will provide the following services for Mechanical, Electrical and Plumbing Engineering <br />for this phase: <br /> <br />1. Coordination with the architect on both the renovation layout and a pre-fabricated concrete layout plan. <br /> <br />Meetings: <br />• One all team kick off meeting. <br />• 1 team coordination meeting. <br /> <br /> <br />Phase 10 – Schematic Design <br />Task XCE1 – Cost Estimation - Legion Park, 145 Alverson Blvd <br />Task XCE2 – Cost Estimation - TA Sullivan Park, 11405 Silver Lake Rd <br />Task XCE3 – Cost Estimation - Forest Park, 802 E. Mukilteo Blvd
The URL can be used to link to this page
Your browser does not support the video tag.