Laserfiche WebLink
<br />Page 14 <br />(Form Approved by City Attorney’s Office November 1, 2009) <br />Task XCE4 – Cost Estimation - Howarth Park, 1127 Olympic Blvd <br /> <br />Bill Acker will provide cost estimating services at the conclusion of this phase for all four parks and for both options <br />provided by BCRA for each park. <br /> <br />Deliverables: <br />• Cost estimates <br /> <br /> <br />Phase 30 – Construction Documents <br />Task A1 – Architecture - Legion Park, 145 Alverson Blvd <br />Task A2 – Architecture - TA Sullivan Park, 11405 Silver Lake Rd <br />Task A3 – Architecture - Forest Park, 802 E. Mukilteo Blvd <br /> <br />Develop the Construction Document drawings to the level suitable for permit submittal to the authority having <br />jurisdiction (AHJ) and construction. The following activities will be performed: <br /> <br />1. Update project schedule. <br /> <br />2. Finalize interior layout. <br /> <br />3. Finalize coordination of the following building systems, performance criteria, associated details, products <br /> and specifications. <br /> <br />a) Materials and finishes <br />b) Mechanical, Electrical, and Plumbing coordination (interior outlets, interior and exterior lighting, exhaust <br /> fan(s), heat trace, potential low voltage system). <br />c) Accessibility <br /> <br />4. Prepare 60% drawings and draft technical specifications for client to review and comment. <br /> <br />5. Review and comment on Client-provided Division 01 specifications. <br /> <br />6. Prepare construction documents drawings for building permit applications. <br /> <br />7. Prepare Bid set for bidding, including: <br />a) Complete technical specifications. <br />b) Revisions required during building permit review. <br /> <br />8. Provide 60% drawings and assist cost estimator for cost estimates. <br /> <br />9. Provide bid set and assist cost estimator for cost estimates. <br /> <br />Meetings: <br />• 2 client meetings are anticipated. <br />• 1 design team coordination meeting. <br /> <br />Assumptions: <br />• Duration for this phase will be 8 weeks to building permit set. Two weeks for Bid set after building permit <br /> approval. <br />• Client will provide final approval of all drawings. <br />• The following specification sections are not included: <br /> <br />o Division 00. <br />o 08 7100 Door Hardware Specifications and Schedules – by Client or hardware consultant, BCRA can <br /> coordinate with hardware specification writer.