Laserfiche WebLink
<br />Page 15 <br />(Form Approved by City Attorney’s Office November 1, 2009) <br />o 08 7400 Access Controls – by Client or access control consultant. Deliverables: <br />• Progress reports <br />• 60% review set in PDF format and drawings in CAD format <br />• Permit Set in PDF format and drawings in CAD format <br />• Bid set in PDF format and drawings in CAD format <br /> <br /> <br />Phase 30 – Construction Documents <br />Task XM1 – MEP - Legion Park, 145 Alverson Blvd <br />Task XM2 – MEP - TA Sullivan Park, 11405 Silver Lake Rd <br />Task XM3 – MEP - Forest Park, 802 E. Mukilteo Blvd <br /> <br />Design West Engineering will provide the following services for Mechanical, Electrical and Plumbing Engineering <br />for this phase: <br /> <br />1. CSI Book format Mechanical, Plumbing and Electrical specifications <br /> <br />2. Completion of applicable governing agency comments (plan check comments) <br /> <br />3. Review of quantities and scope within contraction cost estimates provided by architect <br /> <br />4. Engineering calculations required to generate HVAC, plumbing and electrical design <br /> <br />5. Demolition plans <br /> <br />6. Mechanical plan(s) including the following: <br />a) Schedule of mechanical equipment <br />b) Locations of exhaust fans as required <br /> <br />7. Plumbing plan(s) including the following: <br />a) Schedule of plumbing fixtures <br />b) Complete plumbing system layout and sizing as required including domestic waste and vent, domestic <br /> water (hot and cold) <br />c) Building utilities points of connection up to 5 feet outside of building <br /> <br />8. Lighting plan(s) including the following: <br />a) Schedule of lighting fixtures <br />b) Lighting layout and circuiting <br />c) Energy code lighting compliance forms <br />d) Lighting control wiring diagrams <br /> <br />9. Electrical power plan(s) including the following: <br />a) Coordination with existing electrical service and panelboards <br />b) Distribution and branch panel locations <br />c) Single line diagram <br />d) Load schedules <br />e) Panel schedules <br />f) Convenience receptable layout and circuiting <br />g) Voltage drop calculations <br />h) Electrical connections to low voltage devices as specified by other system designs <br />i) HVAC and plumbing equipment power connections specified by Mechanical Engineer <br /> <br />10. Signal plan(s) including the following: <br />a) Coordination with low voltage designer or vendor for pathways, power requirements and device locations <br /> only for access control and security systems as required <br />