My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCRA Inc. 5/11/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BCRA Inc. 5/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:49:20 AM
Creation date
6/6/2023 10:53:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BCRA Inc.
Approval Date
5/11/2023
End Date
12/31/2026
Department
Parks
Department Project Manager
Lolly Huggins
Subject / Project Title
Parks Restrooms Renovation Project
Tracking Number
0003723
Total Compensation
$197,060.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
BCRA Inc 10/27/2023 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 15 <br />(Form Approved by City Attorney’s Office November 1, 2009) <br />o 08 7400 Access Controls – by Client or access control consultant. Deliverables: <br />• Progress reports <br />• 60% review set in PDF format and drawings in CAD format <br />• Permit Set in PDF format and drawings in CAD format <br />• Bid set in PDF format and drawings in CAD format <br /> <br /> <br />Phase 30 – Construction Documents <br />Task XM1 – MEP - Legion Park, 145 Alverson Blvd <br />Task XM2 – MEP - TA Sullivan Park, 11405 Silver Lake Rd <br />Task XM3 – MEP - Forest Park, 802 E. Mukilteo Blvd <br /> <br />Design West Engineering will provide the following services for Mechanical, Electrical and Plumbing Engineering <br />for this phase: <br /> <br />1. CSI Book format Mechanical, Plumbing and Electrical specifications <br /> <br />2. Completion of applicable governing agency comments (plan check comments) <br /> <br />3. Review of quantities and scope within contraction cost estimates provided by architect <br /> <br />4. Engineering calculations required to generate HVAC, plumbing and electrical design <br /> <br />5. Demolition plans <br /> <br />6. Mechanical plan(s) including the following: <br />a) Schedule of mechanical equipment <br />b) Locations of exhaust fans as required <br /> <br />7. Plumbing plan(s) including the following: <br />a) Schedule of plumbing fixtures <br />b) Complete plumbing system layout and sizing as required including domestic waste and vent, domestic <br /> water (hot and cold) <br />c) Building utilities points of connection up to 5 feet outside of building <br /> <br />8. Lighting plan(s) including the following: <br />a) Schedule of lighting fixtures <br />b) Lighting layout and circuiting <br />c) Energy code lighting compliance forms <br />d) Lighting control wiring diagrams <br /> <br />9. Electrical power plan(s) including the following: <br />a) Coordination with existing electrical service and panelboards <br />b) Distribution and branch panel locations <br />c) Single line diagram <br />d) Load schedules <br />e) Panel schedules <br />f) Convenience receptable layout and circuiting <br />g) Voltage drop calculations <br />h) Electrical connections to low voltage devices as specified by other system designs <br />i) HVAC and plumbing equipment power connections specified by Mechanical Engineer <br /> <br />10. Signal plan(s) including the following: <br />a) Coordination with low voltage designer or vendor for pathways, power requirements and device locations <br /> only for access control and security systems as required <br />
The URL can be used to link to this page
Your browser does not support the video tag.