My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCRA Inc. 5/11/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BCRA Inc. 5/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:49:20 AM
Creation date
6/6/2023 10:53:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BCRA Inc.
Approval Date
5/11/2023
End Date
12/31/2026
Department
Parks
Department Project Manager
Lolly Huggins
Subject / Project Title
Parks Restrooms Renovation Project
Tracking Number
0003723
Total Compensation
$197,060.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
BCRA Inc 10/27/2023 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 17 <br />(Form Approved by City Attorney’s Office November 1, 2009) <br />2. Respond to bidder questions. <br /> <br />3. Prepare and distribute up to three addenda during bidding phase. <br /> <br />4. Consultant will assist in bid evaluation only of the apparent low bidder, including checking contractor <br /> references. <br /> <br />Meetings: <br />• Pre-Bid meeting in person <br />• One meeting with client on bid evaluations Assumptions: <br />• Client will advertise project for bidding and distribute documents as needed. Deliverables: <br />• Pre-bid meeting notes <br />• Addenda <br /> <br /> <br />Phase 45 – Bidding <br />Task XM1 – MEP - Legion Park, 145 Alverson Blvd <br />Task XM2 – MEP - TA Sullivan Park, 11405 Silver Lake Rd <br />Task XM3 – MEP - Forest Park, 802 E. Mukilteo Blvd <br /> <br />Design West Engineering will provide the following services for Mechanical, Electrical and Plumbing Engineering <br />for this phase: <br /> <br />1. Attend one (1) pre-bid meeting to cover all park restrooms. <br /> <br />2. Provide response to RFIs to Architect <br /> <br />3. Provide clarifications and revisions to drawings and/or specifications when required <br /> <br /> <br />Phase 50 – Construction Administration <br />Task A1 – Architecture - Park, 145 Alverson Blvd <br />Task A2 – Architecture - TA Sullivan Park, 11405 Silver Lake Rd <br />Task A3 – Architecture - Forest Park, 802 E. Mukilteo Blvd <br /> <br />Perform tasks associated with Construction Administration in conjunction with Owner and General Contractor. The <br />following activities will be performed. <br /> <br />1. Consultant will attend pre-construction meeting, take notes, and distribute the meeting notes. <br /> <br />2. Respond to valid construction RFIs. <br /> <br />3. Review only required submittals identified in the specifications, and no more than one resubmittal. <br />a) Establish and maintain submittal log <br />b) Coordinate with owner on submittal required to be reviewed by Client. <br /> <br />4. Use Tonic DM for document management. <br /> <br />5. Perform one (1) site visits during construction for progress check. <br /> <br />6. Perform punch list walk and back check walk. Time and fee assume one initial walk of building and one <br /> back check walk. Additional back checks necessary to verify punch list items are complete will be <br /> additional services. <br /> <br />7. Provide a Certificate of Substantial Completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.