<br />Page 18 <br />(Form Approved by City Attorney’s Office November 1, 2009) <br />8. Prepare post-construction Record Drawings based on as-built information provided by the General <br /> Contractor. <br /> <br />Meetings: <br />• 1 site visit for progress check Assumptions: <br />• Assuming construction duration will be 6 months. An average of 1 FTE for 2 hours a week for the duration <br /> of construction has been budgeted. Some weeks will have more hours than others over the course of the <br /> project due to the differing phases of construction. Should our estimated duration or amount of effort <br /> increase, an additional service request will be submitted for approval prior to performing the work. <br />• Client will approve change order and pay applications. <br />• Attendance at construction progress meetings can be provided as an additional service. Deliverables: <br />• Progress reports <br />• Comments on contractor’s punch list <br />• Certificate of Substantial Completion <br />• Record Drawings <br /> <br /> <br />Phase 50 – Construction Administration <br />Task XM1 – MEP - Legion Park, 145 Alverson Blvd <br />Task XM2 – MEP - TA Sullivan Park, 11405 Silver Lake Rd <br />Task XM3 – MEP - Forest Park, 802 E. Mukilteo Blvd <br /> <br />Design West Engineering will provide the following services for Mechanical, Electrical and Plumbing Engineering <br />for this phase: <br /> <br />1. Provide response to RFIs to Architect <br /> <br />2. Review and return to the Architect, shop drawings and submittals <br />a) Submittals will be returned no later than 5 business days unless otherwise coordinated with the project <br /> team. If longer review is needed DWE will inform the project team <br /> <br />3. Final site visit with “punch list” <br /> <br />4. Prepare required project close reports and documentation <br /> <br />5. Prepare As-Built/ record drawings based on contractor notes and redlines. <br /> <br />General Assumptions - BCRA <br /> <br />1. Civil engineering, landscape architectural, and structural engineering will only be required for the Howarth <br /> Park Restrooms (new building and location). <br /> <br />2. Utilities (Sanitary sewer, electrical supply and water supply) to each of the existing restrooms that are to <br /> remain/renovate is sufficient and will not require modifications. <br /> <br />3. HazMat surveys will be conducted by the Client, if needed. <br /> <br />4. Land survey will be provided by the Client for Howarth Park only. All other parks will not include any site <br /> work outside of each building’s envelope, including roofs. <br /> <br />5. Geotechnical information will be provided by the client, if needed. <br /> <br />6. Consultant will prepare as-built documents based on existing documents provided by client and will field <br /> verify measurements for each restroom. <br /> <br />7. Project will be designed to the 2021 IBC.