My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mackenzie 2/27/2023 Amendment 3
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Mackenzie 2/27/2023 Amendment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:21:37 PM
Creation date
6/9/2023 2:21:12 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Mackenzie
Approval Date
2/27/2023
Council Approval Date
2/22/2023
End Date
12/31/2026
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB PW Tenant Improvement Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
3
Tracking Number
0002598
Total Compensation
$2,256,205.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />The design team will review the completed cost estimate and validate that it accurately <br />reflects the documents prior to the Department review. Upon review with Client and key <br />stakeholders, the estimate and design will be adjusted to ensure the project is within the <br />expected budget. <br /> <br />50% Construction Documents shall include: <br /> <br />1. Provide design development documents based on approved schematic design <br />documents. Design documents shall illustrate and describe the refinement of the design of <br />the project, establishing the scope, relationships, forms, size, and appearance of the <br />project by means of: <br /> <br />A. Code analysis and egress plans. <br /> <br />B. Architectural floor plan (including demolition floor plans and elevator <br />modernization). <br /> <br />C. Roof plan. <br /> <br />D. Reflected ceiling plan. <br /> <br />E. Finish floor Plan/Schedule of Interior Finishes. <br /> <br />F. Interior Elevations. <br /> <br />G. Up to two (2) interior renderings. <br /> <br />H. Mechanical, plumbing, and electrical plans; develop options of major building <br />systems (HVAC, mechanical, electrical, lighting, plumbing). <br /> <br />I. Specifications consisting of: <br />a. Identification of architectural materials, systems, and equipment and <br />their criteria/quality standards. <br />b. Investigation of availability and suitability of architectural materials, <br />systems, and equipment. <br />c. Coordination of similar activities of other disciplines. <br /> <br />2. Interior concepts shall be evaluated and proposed to include two (2) interior finish <br />schemes to be presented to Client and stakeholders at the end of 50% Construction <br />documents. <br /> <br />3. Issue 50% Construction Documents for Client, General Contractor, and stakeholders to <br />review. <br /> <br />4. Provide project cost estimate of probable construction costs, consultant costs, and <br />Owner costs. <br />A. Consultant services are understood to be the preparation of cost estimates at <br />the Schematic Design, Design Development (50%), and Construction Documents
The URL can be used to link to this page
Your browser does not support the video tag.