My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DKS Associates 3/27/2023 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
DKS Associates 3/27/2023 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:19:36 PM
Creation date
6/9/2023 3:19:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
DKS Associates
Approval Date
3/27/2023
Council Approval Date
3/22/2023
End Date
12/31/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Traffic signal modifications at Evergreen Way and 79th Pl SE
Public Works WO Number
PW3737, PW3790
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003347
Total Compensation
$162,372.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 – 10% Design (Supplemented) <br /> <br />The CONSULTANT will prepare a 10% traffic signal design exhibit / sketch for <br />discussion with the City. The consultant will discuss material lead-time, supply <br />chain risks, and unit prices. <br /> <br />Deliverables: <br />• 10% traffic signal design Exhibit/Sketch <br />• 10% traffic signal Engineer’s Estimates <br /> <br />Task 5 – 60% Design (Supplemented) <br /> <br /> <br />The CONSULTANT will prepare 60% complete design plans in AutoCAD format <br />following City of Everett’s standard plan preparation formats. The CONSULTANT <br />will prepare plans for the following: <br /> <br />• At 79TH Pl and Evergreen Way: <br />o Remove and relocate two Traffic Signal junction boxes, including the <br />signal home run box. The signal cabinet will remain. <br />o Install loops on side streets, video detection on Evergreen. <br />o Install APS pushbutton and posts as needed to meet ADA requirements. <br /> <br />The 60% design includes the following plan sheets: <br />1. Cover w/ Legend and Notes Survey and alignment (BY City of Everett) <br />2. Legend and Notes, Demolition & Site preparation (BY City of Everett) <br />3. Intersection layout (BY City of Everett) <br />4. Curb ramp details (BY City of Everett) <br />5. Traffic Controller Boxes (BY CONSULTANT) <br />6. Signal Detection Plan (BY CONSULTANT) <br />7. Signal Phasing and Wire Schedule (BY CONSULTANT) <br />8. Signal Details (BY Consultant) <br />9. Total Number of Sheets is 10 (5 by consultant and 5 by City) <br /> <br />Work Elements: <br />• Coordination with the City, including preparing design exhibits for <br />coordination meetings. <br /> <br />Deliverables: <br />• 60% Plans, Traffic signal and ITS Specifications only for insertion into <br />City’s master package & Estimate in electronic format (native and PDF <br />format) <br />• 10% comment and resolution documentation <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.