My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DKS Associates 3/27/2023 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
DKS Associates 3/27/2023 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:19:36 PM
Creation date
6/9/2023 3:19:19 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
DKS Associates
Approval Date
3/27/2023
Council Approval Date
3/22/2023
End Date
12/31/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Traffic signal modifications at Evergreen Way and 79th Pl SE
Public Works WO Number
PW3737, PW3790
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003347
Total Compensation
$162,372.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Task 6 90% DESIGN SUBMITTAL <br /> <br />The CONSULTANT will review and address the City comments on the 60% <br />design submittal and prepare 90% design plans. <br /> <br />The CONSULTANT will prepare 90% complete design plans in AutoCAD <br />format following City of Everett’s standard plan preparation formats. <br /> <br />The CONSULTANT will provide documentation of their QA/QC process to <br />the City for review and copies of QA/QC mark-ups will be submitted as part <br />of each design submittal. <br /> <br />The CONSULTANT will update specifications for their own design elements <br />to a 90% level. The City will compile the project specification for the whole <br />project, including section one of the specification. <br /> <br />The CONSULTANT will update quantity takeoffs and prepare a 90% <br />estimate of probable construction costs. <br /> <br />The CONSULTANT will attend the 60% design review meeting to clarify and <br />address review comments. The meeting will be up to one hours long, and <br />the CONSULTANT will document responses to ensure that any outstanding <br />issues are addressed. <br /> <br />Deliverables: <br /> <br />• 90% Plans, Traffic signal and ITS Specifications only for <br />insertion into City’s master package & Estimate in electronic <br />format (native and PDF) <br />• 60% comment and resolution documentation. <br /> <br /> <br />Task 7. Final Ad-Ready DESIGN SUBMITTAL <br /> <br />The CONSULTANT will review and address the City comments on the 90% <br />design submittal and prepare final design plans. Minimum comments on the <br />design is expected. <br /> <br />The CONSULTANT will provide documentation of their QA/QC process to <br />the City for review and copies of QA/QC mark-ups will be submitted as part <br />of each design submittal. <br /> <br />The CONSULTANT will update specifications to a final design level. The <br />City will compile the project specification for the whole project, including <br />section one of the specification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.