My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 11 00 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01010-SUMMARY OF WORK <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. This Work consists of the installation of owner furnished wireless charging system <br /> including inductive coils and charging cabinet as shown on the Contract Drawings <br /> and described in these Specifications, including all associated facilities. <br /> B. The contractor shall furnish and install a CT cabinet, revenue meter enclosure, <br /> main service disconnect, isolation transformer, main service panelboard, <br /> conduit/ductbank, raceway, and cables. <br /> C. The contractor shall provide and install all bonding and grounding as shown on the <br /> Contract Drawings. <br /> D. The contractor shall provide and install bollards to protect the electrical panels and <br /> charging cabinets as shown on the Contract Drawings. <br /> E. The contractor shall coordinate with the local electric utility, Snohomish PUD, for <br /> service connection requirements. <br /> F. The contractor shall do the electrical testing and work with the inductive charger <br /> manufacturer who will conduct the field testing and final acceptance testing of the <br /> wireless charging system. <br /> G. The contractor shall be responsible for all permit applications including permit fee. <br /> 1.2 WORK SEQUENCE: The Contractor may mobilize on site or occupy staging areas if <br /> specifically approved by the Owner and if proper permits are in place. Notify the <br /> Construction Manager a minimum of two weeks prior to commencing mobilization at the <br /> site. During the construction period the Contractor shall have full use of the premises for <br /> construction operations pursuant to the restrictions listed in the following Special <br /> Provisions: <br /> A. Time of Completion and Schedule Milestones <br /> B. Access and other Restrictions. <br /> 1.3 OWNER FURNISHED MATERIALS: The Contractor shall review shop drawings, product <br /> data, and samples and inform the Owner of any discrepancies or problems anticipated in <br /> use of the product. <br /> 1.4 DEFINITIONS: Certain terms used throughout the Contract Documents are defined as <br /> follows: <br /> A. Where "as shown", "as detailed" or words of similar import are used, it shall be <br /> understood that reference to drawings accompanying specifications is made <br /> 01 11 00 - 1 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.