Laserfiche WebLink
City of Everett 01 30 00-5 <br /> Inductive Charging Infrastructure for Everett Transit <br /> C. Submittals requiring the Owners or Local Jurisdictions approval shall be made <br /> sufficiently in advance so that approval may be made by the Construction <br /> Manager before commencement of related work. Submittals required for <br /> Qualification of Materials or Product types that require a long lead time for <br /> delivery shall be made sufficiently in advance to allow acceptance by the <br /> Construction Manager before Materials or Products are ordered. Rejection of <br /> any submittal required by this Section will not be accepted as a basis for any <br /> claim for delay. <br /> D. Submittals requiring the Owners or Local Jurisdictions approval will be returned <br /> or responded to as specified in the General Provisions. <br /> E. Revise and resubmit submittals as required. Identify all changes made since <br /> previous submittal. <br /> F. Supplemental submittals initiated by the Contractor for consideration of corrective <br /> procedures shall contain sufficient data for review. Make supplemental <br /> submittals in the same manner as initial submittals. <br /> 2.3 QUANTITIES <br /> A. Submittals requiring the Owners or Local Jurisdictions approval shall be made in <br /> the following quantities: <br /> 1. Six (6) prints of each Shop Drawing and Working Drawing. <br /> 2. Six (6) copies of manufacturers' standard schematic drawings. <br /> 3. Six (6) copies of manufacturers' calculations and standard data. <br /> 4. Six (6) copies of manufacturers' printed installation, erection, application, <br /> and placing instructions. <br /> 5. Six (6) copies of inspection reports, test reports and certificates of <br /> compliance. <br /> 6. Submit three (3) Samples, unless otherwise specified in a specific <br /> Specification Section, of each item, one of which will be retained by the <br /> Owner. Reviewed samples which may be used in Work are indicated in <br /> individual Specification Sections. <br /> B. Submittals not requiring the Owners approval, sent only for record, shall be made <br /> in the following quantities: <br /> 1. One (1) print of each Shop Drawing and Working Drawing. <br /> 2. One (1) copy of manufacturers' standard schematic drawings. <br /> 01 30 00 - 5 SUBMITTALS <br />