City of Everett 01 57 00 - 7 <br /> Inductive Charging Infrastructure for Everett Transit <br /> silencing. The type of silencer required is that for use in critical noise problem locations <br /> such as high density residential, hotel, and hospital areas. <br /> B. The Contractor shall conduct performance of the Work consistent with the applicable <br /> noise control levels set forth in the City of Everett Ordinance# 1556-89. <br /> 1.12 TEMPORARY WATER POLLUTION, EROSION AND SEDIMENTATION CONTROL <br /> (TESC) <br /> A. TESC measures will be installed prior to any site work. <br /> B. TESC control work shall comply with the City of Everett Construction Stormwater Manual <br /> (current edition) and the Regional Road Maintenance Program part 2-Best Management <br /> Practices which consist of temporary measures that may be indicated in the Contract, <br /> that may be proposed by the Contractor and approved by the Owner, or may be ordered <br /> by the Owner during performance of the Work. This temporary work is intended to <br /> provide prevention, control, and abatement of water pollution/erosion/sedimentation <br /> within the limits of the Project, and to minimize damage to the Work, adjacent property, <br /> streams, and other bodies of water. <br /> C. Controlling and preventing pollution, erosion, run off, sedimentation, and related damage <br /> may require the Contractor to perform temporary work items including but not limited to: <br /> 1. Providing ditches, berms, culverts, and other measures to control surface water; <br /> 2. Building dams, settling basins, energy dissipaters, and other measures, to control <br /> downstream flows and rates of flow; <br /> 3. Controlling underground water found during construction; or <br /> 4. Stabilize soils by covering or otherwise protecting slopes until permanent erosion <br /> control measures are working. <br /> D. The Contractor is hereby notified that compliance with these requirements may <br /> necessitate performance of certain items of work at a different time or in a different <br /> manner than has been considered normal construction practices in the past and that <br /> such revisions in scheduling of Work may interfere with said normal construction <br /> practices. <br /> E. The Contractor shall coordinate temporary water pollution/erosion/sedimentation control <br /> work with the permanent drainage, sedimentation, and erosion control work that may be <br /> specified in the Contract to ensure continuous water pollution/erosion/sedimentation <br /> control is maintained during performance of the Work. <br /> F. The extent of excavation, borrow, and embankment operations in progress will be limited <br /> commensurate with the Contractor's capability and progress in keeping the finish <br /> grading, mulching, seeding, and other permanent pollution/erosion/sedimentation <br /> control measures current according to the accepted critical path schedule. If the Owner <br /> determines that water pollution or erosion or sedimentation could occur due to seasonal <br /> limitations, the nature of the material, or the Contractor's progress, temporary water <br /> pollution/erosion/sedimentation control measures shall be taken immediately. TheOwner <br /> may require the Contractor's operations to be scheduled so those permanent <br /> pollution/erosion/sedimentation control features will be installed concurrently with or <br /> immediately following grading operations. <br /> 01 57 00 - 7 TEMPORARY CONTROLS <br />