My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 72 29- 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 72 29 -CUTTING AND PATCHING <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> A. Section Includes: Procedural execution requirements and limitations for incidental <br /> cutting and patching of in-place work. <br /> B. Related Sections: following Sections contain requirements that relate to this Section: <br /> 1. Section 01 31 13 - Project Coordination for procedures for coordinating cutting <br /> and patching with other construction activities. <br /> 2. Section 01 35 44 - Hazardous Materials Procedures <br /> 3. Division 21 -27 - Fire Suppression, Plumbing, Mechanical, Electrical, and <br /> Telecommunications for other requirements and limitations <br /> applicable to cutting and patching <br /> 1.2 DEFINITIONS <br /> A. Cutting: Cutting into in-place work for installation or extension of other work. <br /> B. Patching: Subsequent fitting and repair, as necessary to restore construction and <br /> finished surfaces to specified condition. <br /> C. Cutting and Patching: Does not include following: <br /> 1. Off-site work during manufacturing and fabrication of products. <br /> 2. Initial work involving installation and erection processes. <br /> 3. Drilling of holes to install fasteners. <br /> 1.3 ADMINISTRATIVE REQUIREMENTS <br /> A. Coordination: <br /> 1. Conform to Section 01 31 00 for coordination with work of other Sections. <br /> 2. Coordinate procedures and potential conflicts between work of different sections <br /> and conditions requiring cutting and patching. <br /> B. Preinstallation Meetings: <br /> 1. Arrange meetings at Project Site with parties involved in cutting and patching, <br /> including mechanical and electrical trades. <br /> 2. Review areas of potential interference and resolve conflicts before proceeding. <br /> 1.4 SUBMITTALS <br /> 01 72 29 - 1 CUTTING AND PATCHING <br />
The URL can be used to link to this page
Your browser does not support the video tag.