My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 72 29-3 <br /> Inductive Charginq Infrastructure for Everett Transit <br /> 6. Structural calculations prepared, stamped, and signed by licensed professional <br /> engineer for cutting and patching effecting existing structural elements. Include for <br /> additional reinforcement, shoring, and integration of new structural elements into <br /> existing in-place construction not shown on Contract Drawings. Review is required <br /> by Professional Engineer of Record. <br /> B. Owner reserves right to reject unsatisfactory cutting and patching and to require removal <br /> and replacement with new work despite acceptance of Cutting and Patching Plan. <br /> 1.6 QUALITY ASSURANCE <br /> A. Qualifications: <br /> 1. Where possible, retain original installers and fabricators, for cutting and patching <br /> of construction of acceptable workmanship. <br /> 2. Where original installers and fabricators are unavailable, employ another <br /> recognized, experienced, and specialized firm, skilled and experienced in <br /> workmanship required to perform cutting and patching procedures. <br /> a. Conform to qualifications for Sections specifying materials and systems <br /> being cut and patched. <br /> b. Submit satisfactory evidence documenting experience and qualifications for <br /> projects of equivalent quality and scope upon request by Architect. <br /> 3. Where original work required specialists or a specific trade, execute cutting and <br /> patching utilizing same specialist or trade, except where conditions are such that <br /> another specialist or trade is better suited due to perform the work. <br /> B. Visual Requirements: <br /> 1. Perform cutting and patching in manner as accepted by Architect to maintain <br /> aesthetic qualities. <br /> 2. Cut and patch in manner so as to leave no visual evidence. <br /> C. Structural Elements: Where cutting is required for installation of subsequent work, verify <br /> in writing from Architect and obtain direction prior to proceeding. <br /> 1. Cut and patch in ways that will not affect load-carrying capacities and load- <br /> deflection ratios. <br /> 2. Plan and engineer cutting and patching, including for following. <br /> a. Foundation construction. <br /> b. Bearing and retaining walls. <br /> c. Structural concrete. <br /> d. Structural steel. <br /> e. Miscellaneous structural metal fabrications. <br /> f. Steel decking. <br /> g. Lintels. <br /> h. Timber and wood primary framing. <br /> i. Stair systems. <br /> 01 72 29- 3 CUTTING AND PATCHING <br />
The URL can be used to link to this page
Your browser does not support the video tag.