My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 26 00 10 - 12 <br /> Inductive Charqinq Infrastructure for Everett Transit <br /> 1.7 ACTION SUBMITTALS <br /> A. Coordination drawings. <br /> 1.8 INFORMATIONAL SUBMITTALS <br /> A. Electrical installation schedule. <br /> B. Qualification statements. <br /> C. Welding certificates. <br /> D. Seismic-load performance certificates. <br /> E. Delegated design drawings for structural masonry wall penetrations. <br /> 1.9 CLOSEOUT SUBMITTALS <br /> A. Facility EPM program binders. <br /> B. Operation and maintenance data. <br /> C. Software and firmware operational documentation. <br /> D. Software. <br /> 1.10 QUALITY ASSURANCE <br /> A. Qualifications: Prepare and submit qualification statements for the following entities <br /> performing Work on Project: <br /> 1. Qualified Regional Manufacturer: Manufacturer, possessing qualifications <br /> specified in Section 014000 "Quality Requirements," that maintains a service <br /> center capable of providing training, parts, and emergency on-site repairs to <br /> Project site with response time less than eight hours. <br /> 2. Structural Professional Engineer: Professional engineer possessing active <br /> qualifications specified in Section 014000 "Quality Requirements," with expertise <br /> in structural engineering. <br /> 3. Electrical Professional Engineer: Professional engineer possessing active <br /> qualifications specified in Section 014000 "Quality Requirements," with expertise <br /> in electrical engineering, including electrical power system modeling and analysis <br /> of electrical safety in accordance with NFPA 70E. <br /> 4. Lighting Professional Engineer: Professional engineer possessing active <br /> qualifications in accordance with Section 014000 "Quality Requirements" and the <br /> following: <br /> a. Expertise in electrical engineering, lighting design, and structural <br /> requirements for exterior poles and standards. <br /> b. Lighting Certified (LC) Professional by the National Council on <br /> Qualifications for the Lighting Professions (NCQLP). <br /> 26 00 10 - 12 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.