My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction 6/12/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Valdez Construction 6/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2025 12:10:36 PM
Creation date
6/16/2023 10:20:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction
Approval Date
6/12/2023
Council Approval Date
5/10/2023
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Eclipse Mill Park Inductive Charging Infrastructure
Tracking Number
0003790
Total Compensation
$923,272.10
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Valdez Construction 10/10/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/1/2024 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Valdez Construction 5/5/2025 Change Order 3
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 32 16 13 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 32 16 13 - CEMENT CONCRETE PAVING <br /> PART 1 -GENERAL <br /> 1.1 DESCRIPTION <br /> A. This Section includes requirements for providing Portland Cement Concrete pavement <br /> for roadways, driveways, sidewalks, curbs, and curb ramps. <br /> 1.2 STANDARD SPECIFICATIONS <br /> A. All Work to be performed and materials to be used shall be in accordance with the <br /> latest version of the Standard Specifications and Standard Plans for Road, Bridge and <br /> Municipal Construction as published by the Washington State Department of <br /> Transportation (WSDOT), unless otherwise indicated herein. <br /> B. The Contractor shall have one copy of the Standard Specifications and Standard Plans <br /> at the job site. <br /> C. The Standard Specifications apply only to performance and materials and how they are <br /> to be incorporated into the work. The legal/contractual relationship sections and the <br /> measurement and payment sections do not apply to this document. <br /> 1.3 SUBMITTALS AND TRANSMITTALS <br /> A. Submit the following: <br /> 1. Concrete Mix Designs: Comply with WSDOT Standard Specifications Section 5- <br /> 05. <br /> 2. Shop Drawings: <br /> a. Provide drawings showing the locations of all joints in concrete, including <br /> construction joints, expansion joints, isolation joints, and contraction joints. <br /> b. Provide drawings indicating concrete placement method, sequence, <br /> location, and boundaries. Include each type and class of concrete and <br /> quantity in cubic yards. <br /> B. Transmit the following: <br /> 1. Product Data: Provide manufacturers' product data for proposed concrete <br /> admixtures. <br /> 2. Detectable warning surface for curb ramps. Transmit manufacturer's cut sheets for <br /> detectable warning surfaces. <br /> PART 2 - PRODUCTS <br /> 2.1 MATERIALS <br /> A. Materials in construction of cement concrete pavements, including but not limited to <br /> Portland cement, aggregates, reinforcing steel, curing materials and admixtures as shall <br /> comply with WSDOT Standard Specifications Section 5-05.2 <br /> 32 16 13 - 1 CEMENT CONCRETE PAVING <br />
The URL can be used to link to this page
Your browser does not support the video tag.