Item/Task Document Reference Precon. Const. Specified Cost of Negotiated Const. Owner <br /> Services Cost Manager's General Work/MACC Support Manager's <br /> Fee Conditions Services Contingency <br /> In order to assist the GC/CM proposers in developing the cost associated with the segments of the fee proposals process and how costs are intended to be treated under the Contract Documents,the Owner is providing the <br /> following Cost Responsibility Matrix(CRM).The shaded and checked box indicates in what section the Owner expects the GC/CM proposer to apply the identified costs.This list is not Intended to be a complete list of activities and <br /> costs required to complete the project,but a guide outline.Proposers should refer to the Request for Final Proposals(RFFP)along with the Contract Documents(Agreement&General Conditions),including all addenda,to <br /> ascertain all of the full project scope requirements.In the event there is conflict or omitted items contained in the CRM,the Contract Documents shall govern.Note that there are some items listed in the CRM that are not <br /> specifically addressed in the RFFP or Contract Documents but have been added to this CRM to clarify scope.These clarified scope items shall be included in the scope of services. <br /> Provide,install and maintain erosion control measures. N/A X <br /> Provide,install and maintain scaffolding and shoring. N/A X <br /> Temporary elevator operations during construction and prior to N/A x <br /> inspection/approval by WA L&I. <br /> Weather protection costs not included in subcontractor bid scope. N/A X <br /> Building system mockups required by Contract Documents. N/A X <br /> Test Engineer Services Spec Section 0175 DO-1.2.A X <br /> Electrical Testing Subcontractor. Spec Section 0175 00-1.2.0 X <br /> Temporary fire protection. Spec Section 0150 00-1.6.E X <br /> Furnish adequate temporary facilities for the sole use of the Owner's Testing <br /> Agency to provide safe storage and curing space for test specimens that Spec Section 0145 23-1.4.D X <br /> must remain on-site prior to transport to the laboratory. <br /> Provide,install,maintain and remove miscellaneous temporary construction <br /> to protect the Work,including but not limited to,all required tarpaulins, <br /> canopies,warning signs,steps,bridges,platforms and other temporary Spec Section 0150 00-1.7.B X <br /> construction necessary for the safe and proper completion of the Work. <br /> Provide,install,maintain and remove temporary noise barriers between <br /> work equipment and adjacent facilities or properties as required to Maintain <br /> the sound pressure level of exterior construction noise from exceeding 60 <br /> decibels with a frequency rating function A(60 dBA)inside adjacent facilities Spec Section 0150 00-1.S.B X <br /> with windows closed between the hours of 7:30 a.m.and 5:30 p.m <br /> weekdays <br /> Services of Contractor's Structural Engineer and Contractor's Surveyor Spec Section 01 71 23-1.3.A&1.5.A X <br /> Travel expenses for out of town travel for project specific purposes,only if N/A X <br /> approved by the Owner, <br /> Construction Manager's Contingency(Definition) A133-2.0.9&3.2.4.1 X <br /> Costs related to project and design issues that a reasonable construction A133-3.2.4.1 X <br /> manager should have resolved during Precon. <br /> Page 10 RHS Draft Cost Resp Matrix 12-14-21.xlsx <br />