B. Contractor shall submit verification of the above rates, if requested by Owner or <br /> Architect. <br /> C. Prior to submitting Contractor's first COR or responding to the Architect's first PR that <br /> involves equipment owned by the Contractor, the Contractor shall submit a list of all <br /> equipment anticipated to be used on the Project. Contractor shall provide the hourly rate <br /> based on the Equipment Watch Rental Rate Blue Book and as modified by the current <br /> AGC/WSDOT Agreement or other sources as referenced in the General Conditions.The <br /> Contractor shall use the Equipment Rates form included in the Appendix to compute the <br /> equipment rate. <br /> 1.3 CHANGE ORDER PROCEDURES <br /> A. Architect or Owner Proposal Request (PR): Changes may be initiated by Architect or <br /> Owner through a Proposal Request form submitted to the Contractor. Such a request <br /> is for information and pricing only and is not an instruction to execute changes or to stop <br /> work in progress, unless issued as a Construction Change Directive. <br /> 1. The PR will include: <br /> a. A detailed description of changes, products, and location of modification in <br /> Project and a statement as to whether overtime work is authorized; and, <br /> b. Supplementary or revised Drawings or Specifications. <br /> 2. An updated Construction Progress Schedule may be requested if the PR <br /> impacts the existing Construction Progress Schedule. <br /> B. Contractor Change Order Request (COR): The Contractor shall initiate changes by <br /> submitting written correspondence, in letter format, signed and dated to the Architect <br /> requesting a Proposal Request. The letter shall include: <br /> 1. Description of proposed changes; <br /> 2. Reason for making changes; <br /> 3. A specific period of time during which requested price will be considered valid; <br /> 4. Actions required by Owner; <br /> 5. Effect on Total Contract Cost and Contract Time; <br /> 6. Documentation consistent with the Article 7 of the General Conditions supporting <br /> any change in Total Contract Cost or Contract Time, as appropriate; <br /> 7. Statement of why proposed change is not covered in Contract Documents; and <br /> 8. Date the Work is to be completed. <br /> C. Construction Change Directive: In situations where time is of the essence or an <br /> emergency condition exists, the Owner may directly order a change to the Work by a <br /> City of Everett Municipal Building February 3, 2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 01 26 00 <br /> Improvements 01 26 00-2 Contract Modifications <br /> RFFP for GC/CM Services <br />