My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. ASI number, numbered sequentially. <br /> 6. Specification Section number and title and related paragraphs, as appropriate. <br /> 7. Drawing number and detail references, as appropriate. <br /> 8. Field dimensions and conditions, as appropriate. <br /> 9. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract <br /> Time or the Contract Sum, Contractor shall state impact in the ASI. <br /> 10. Contractor's signature. <br /> 11. Attachments: Include drawings, descriptions, measurements, photos, Product <br /> Data, Shop Drawings, and other information necessary to fully describe items <br /> needing interpretation. <br /> 1.6 NON-CONFORMING WORK <br /> A. Non-Conforming Work: Work found defective, or in any way not in accordance with <br /> the requirements of the Contract Documents, is defined as non-conforming Work. <br /> B. Procedure: Architect will bring non-conforming work to the attention of the Owner and <br /> Contractor either verbally and/or by written notification. It is the expectation that the <br /> Contractor will take timely, corrective action on non-conforming work. Upon receipt of <br /> notification of non-conforming work, the Contractor shall take immediate action to <br /> assess the non-conformance and resolve the Work to the Architect's satisfaction, or <br /> remove and replace with conforming Work at Contractor's expense and with no <br /> increase in Contract Time. Non-conforming work shall be tracked in the construction <br /> progress meeting minutes until resolved, corrective actions for non-conforming Work <br /> shall be discussed at construction progress meetings and all non-conforming work shall <br /> be completed in a timely manner, but no later than prior to Final Completion. <br /> C. Where non-conforming Work requires re-design by the Architect or additional testing by <br /> the Owner's testing agency, such re-design and testing costs shall be borne by the <br /> Contractor. <br /> 1.7 COORDINATION <br /> A. General Coordination: <br /> 1. The Contractor shall be in charge of this Contract and the Project, as well as directing <br /> and scheduling of all Work. Final responsibility for performance, interface, and <br /> completion of the Project shall be the Contractor's. <br /> a. Anticipate interrelationship of all Subcontractors and their relationship with the <br /> total Work. <br /> b. Resolve differences or disputes between Subcontractors and materials <br /> suppliers concerning coordination, interference, or extent of the Work. <br /> Contractor's decisions, if consistent with Contract Document requirements, shall <br /> be final. <br /> 2. Cooperation with other contractors during the term of this Project may be required <br /> within the building or other adjacent locations to the construction limits of this Project. <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant 01 00 4 Spec Sect 01 31 00 <br /> Improvements Project Management Coordination <br /> RFFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.