My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPEC 5 CSI section number <br /> OF/CI 4 Owner Furnished/Contractor Installed Equipment <br /> 3. The Critical Path shall be clearly indicated on all diagrams submitted. An activity <br /> is critical when it is part of the longest duration pathway(s)through the CPM network <br /> or when its total float is less than or equal to zero. <br /> 4. At the request of the Architect or Owner,furnish a written narrative of the Contractor's <br /> determination of durations for particular activities. Such explanation may include the <br /> number of crews, crew composition, number of shifts per day, number of hours in a <br /> shift, and number of work days per week, construction equipment, material <br /> quantities, productivity qualifiers (such as weather), etc. <br /> 5. At the request of the Architect or Owner, a written explanation shall be provided for <br /> leads and/or lags on relationships and for constrained dates. These scheduling <br /> constraints shall be disallowed unless a compelling reason exists for their use. <br /> 6. Clearly identify activities which are planned to use of overtime, double shifts, work <br /> on weekends or holidays. <br /> 7. Schedule Statistics Report: Each submittal involving graphical and/or tabular reports <br /> using CPM shall be accompanied by a Schedule Statistics Report. Include a listing <br /> of activities with open ends and out of sequence progress, constraints, the <br /> schedule calculation modes (retained; contiguous or interruptible) and other <br /> statistics that are normally a part of this report. <br /> G. Activities shall be cost loaded. The estimated costs to perform each Work activity shall <br /> be assigned to each activity included in the network as specified by the scheduling <br /> software. The sum of the costs assigned to all activities shall equal the Total Contract <br /> Cost in the approved Schedule of Values. No activity costs shall be assigned to <br /> manufacturing or delivery activities unless approved by the Architect. Using the cost <br /> assigned to each activity, develop a cash flow projection demonstrating the estimated <br /> cash draw down by month over the period of the Project. The cash flow projection <br /> shall be illustrated by a graphic display as generated by the computer scheduling <br /> software. <br /> 1. Contractor shall provide Architect with a formula to convert cost loaded activities <br /> to manpower requirements.This formula shall be based upon a percentage allocation <br /> of the cost loading for labor costs and an average hourly labor cost for the Project. <br /> 2. The total cost of each Subcontractor's construction activities in the Final Schedule <br /> of Values "Total Contract Cost" shall be equal to the total Subcontractor's Contract <br /> Sum amount, (see Section 01 29 76 "Progress Payment Procedures"). <br /> 3. Contractor may request and Architect may approve, at its sole discretion, an <br /> alternative resource-loading plan if it is evaluated equally beneficial. <br /> H. Tabular reports required by this section shall be prepared by the scheduling software. <br /> Reports shall contain a listing of the activities as required for the type of report being <br /> prepared. Each activity shall include the following information: <br /> 1. Activity ID; <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 0132 16 <br /> Improvements 01 32 16-4 Construction Progress Schedule <br /> RFFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.