My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
treating the events as it would a typical holiday at the calendar function of the software. <br /> By whatever method the Contractor chooses to account for such delays and events, a <br /> narrative description of the accounting shall be included with the narrative report required <br /> herein this section. The Construction Progress Meeting shall be held prior to the <br /> Architect's review and comment of the Contractor's monthly draft Application for <br /> Payment, unless otherwise approved by Architect. <br /> 1. The Contractor shall provide copies of two tabular reports: <br /> a. A total float report clearly indicating the current critical path through Substantial <br /> Completion. <br /> b. A report of activities sorted by early start dates commencing with the previous <br /> monthly progress update and including all updated activities during the previous <br /> month. Actual progress of the previous month will be recorded and incorporated <br /> into the update. <br /> 2. The Contractor shall provide copies of a narrative report to include: <br /> a. A description of the Work that has progressed. <br /> b. An explanation of the Work that had been scheduled to be performed in <br /> the previous period but as not performed, and why is was not performed. <br /> c. Anticipated delay and impact on schedule. <br /> d. Corrective action recommended and its effect. <br /> e. A discussion of the Work scheduled for the upcoming period noting any issues <br /> or events that could impact this work. <br /> f. If the Contractor intends to make logic or original activity duration change(s), <br /> the report will include such changes. To facilitate Architect's review the <br /> Contractor will provide a report which indicates all proposed changes to the <br /> schedule. <br /> 3. The Contractor, Architect and Owner shall review these reports and discuss any <br /> differences or issues raised. <br /> 1.5 SUBMITTAL SCHEDULE <br /> A. General: Within ten (10) calendar days following the Architect's receipt of the <br /> Baseline Progress Schedule, the Contractor shall prepare and submit to the Architect <br /> a complete schedule of work-related submittals based on the Progress Schedule, as <br /> required by the Contract Documents ("Submittal Schedule"). Correlate Submittal <br /> Schedule with the listing of principal Subcontractors. <br /> 1. The amount specified in Section 01 29 76 shall be withheld from the Contractor's <br /> monthly Application for Payment if the Submittal Schedule, referenced in 1.6 of this <br /> section, is past due. <br /> B. Form: Prepare Submittal Schedule in chronological sequence of submittals. Show <br /> category of submittal, name of Subcontractor, generic description of work covered, <br /> related Specification section numbers, activity or event code on the Progress Schedule <br /> baseline file, scheduled date for first submission, and blank columns for actual date of <br /> submittal, re-submittal, and final release or acceptance by the Architect. The Submittal <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 0132 16 <br /> Improvements 01 32 16-7 Construction Progress Schedule <br /> RFFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.