BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECC <br /> KORa u e t i o nSMO S:Start Date <br /> c a s r C:Completion Date <br /> Four Week Schedule Front:Aug.28-Sept.22,2017 P:Concrete Placement Dale <br /> ATTACHED TO MEETING MINUTES FOR:Eastside Community Center PROJECT k:1004 DATE:August 28,2017 <br /> (CONTRACTOR:Korsmo Construction <br /> SUPERINTENDENT:Jim Gates <br /> Projected Actual Start M T W T F ;: M T W T F :T;:;�:3;:; M T W T F M T W T F ::;:_::: projected Actual <br /> SCOPE ACTIVITIES <br /> SUBCONTRACTOR (Start Dee <br /> Date 28 A U G 1 ;.3;; " 4 S E P 8 ;$-:;:';:;11 S E P 15,:S:::::d::18 S E P 22:a:,2•'::: CompL Date CompL Date <br /> 1 Pool Slab Rebar Reinforcement POOL CO. 18-Aug 21-Aug C 29-Aug 28-Aug <br /> 2 Pool Slab Pour POOL CO. 30-Aug 29-Aug P X P 31-Aug <br /> 3 Strip Pool Slab Formwork POOL CO. 1-Sep S X X C 7-Sep <br /> 4 Pool Shotcrete Walls POOL CO. 5-Sep S X X X .i: .: X X X X X :::. X X X X X 29-Sep <br /> 5 Footings Reber South GL 13(GLJ&28 CIRC PUMP PIT) HARRIS 28-Aug 28-Aug S C 29-Aug <br /> it <br /> 6 Pour Footings South GL 13(GL J&28 CIRC PUMP PIT) KORSMO 31-Aug P 31-Aug <br /> 7 Strip Footings GL 13(GLI&28 CIRC PUMP PIT) KORSMO 1-Sep SC :w`; 1-Sep <br /> 8 Stem Walls Formwork South GL 13(GLJ&28 CIRC PUMP PIT) KORSMO 4-Sep S X X X : C P 12-Sep <br /> 9 Shotcrete East Foundation Wall North GL 15 SUPERIOR 30-Aug S L 31-Aug <br /> 10 Waterproof&Insulate Shotcrete Walls North GL 15 INLAND 6-Sep S X X C `S 11-Sep <br /> •W North TUNISTA 12-Se S X X X C 18-Sep <br /> 11 MSC all o th GL 15 p 1y2 <br /> X > X C <br /> e <br /> S 19 Se <br /> TUNISTA 14-5 P <br /> r <2::] <br /> 12 Footing Drains North GL 15 p �:3?<�:%:` <br /> 13 Strip&Set East Shotcrete Walls South GL 15 KORSMO 1-Sep S i:- X X C 7-Sep <br /> 14 Walls Embeds East Shotcrete Walls South GL 15 KORSMO 7-Sep S X 4: ::i X X X X C T 1S-Sep <br /> 15 Reba Reinforcement East Shotcrete Walls South GL 15 HARRIS 11-Sep S X C 13-Sep <br /> 16 Electrical Rough-ins East Shotcrete Walls South GL 15 EXCEL ELEC 13-Sep E;_i;:i:i:i S X C '22:1 15-Sep <br /> 17 Shotcrete East Foundation Wall South GL 15 SUPERIOR 18-Sep : S X C 20-Sep <br /> 18 Strip Eastshotcrete FoundatianS Walls South GL 15 KORSMO 21-Sep S X 25-Sep <br /> 19 Backfill to Subgrade Kitchen/SOclla Hall North 13 TUNISTA 29-Aug S C ::'`W i?:::::::i ?:::ice :iiii.', 30-Aug <br /> 20 Kitchen&UG Plumbing Rough-ins North GL 13 BETSCHART 30-Aug S X X IliglX X C 7-Sep <br /> 21 Kitchen&UG Electrical Rough-Ins North GL 13 EXCEL RLEC 8-Sep tl tfff 5 :? ` X X X X C i' 15-Sep <br /> 22 SOG Backfill and Capillary Break North GL 13 TUNISTA 19-Sep :'::7 5 X C f 21-Sep <br /> 23 SOG Vapor Barrier and Insulation North GL 13 KORSMO 21-Sep _ 4 S X .0 jll 23-Sep <br /> 23 50G Reber Reinforcement North GL 13 HARRIS 25-Sep �+�:::'^:;:;: 27-Sep <br /> 25 SOD Pour North GL13 OLYMPIC 28-Sep —~►-r 1P.IP 28-Sep <br /> 26 Shear Walls Re bar Re Inlorcement(SW's 1,2&4) HARRIS 28-Aug 28-Aug S C 29-Aug <br /> 29-Au S X C 31-Au <br /> Electrical Rough-ins SW's 1 2&4) EXCEL ELEC. 28-Aug g <br /> 27 g ( <br /> 28 Button-up SW's 1.2&4 KORSMO 1-Sep S X X X X -X ` C 11-Sep <br /> 29 Pour CIP SW's 1,2&4 KORSMO 12-Sep <br /> P 12-Sep <br /> 30 Strip CIP SW's 1,2&4 KORSMO 13-Sep S X C 15-Sep <br /> 31 FAPS Stem Walls at SW's 2&4 KORSMO 15-Sep SC;:;: :'::::: P 18-Sep <br /> E P 22::5.::i�S:::::�:::: ::::::i::::::i:::: >: <br /> •>::28 A U G 1 'b�,:; 9::: 4 S E P 8 ;5(;`S; 11 S E P 15::$::>:5;:18 S ,,,,,,,,,,,,,,,,,,,,, ,,,, <br /> 32 Pour&Finish Sidewalks&Crosswalks NE Parking Lot CALIBER 25-Aug 25-Aug C 28-Aug 28-Aug <br /> 33 NE Parking Lot/Main Access Road Paving TUNISTA 29-Aug S C _ 30-Aug <br /> 34 Temp Striping&Signage/Relocate Temp Fence KORSMO 31-Aug S C ii: 1-Sep <br /> 35 Sewer Connection/Grease Interceptor TUNISTA 28-Aug S X X X X C 5-Sep <br /> 36 Water Main Gate Valve Extension RFI-16.1 TUNISTA 6-Sep S X X X C 12-Sep <br /> :•::.::: <br /> TUNISTA 13-Se :�::::::;: :.::.::::� S X C ....... 3:::�:: : 15-Se <br /> 37 Site TESC/Hydro Seed&Mulch PN.;«. <br /> ACTUAL: CM 4 4 4 4 4 :: <br /> CAPP 4 4 4 4 4 <br /> LAB 1 1 1 1 1 :::: <br /> PROJECTED: C M 5 5 5 5 5 4 4 4 4 4 ;, <br /> 4 4 4 ::4 4 ':: :�: 4 4 - <br /> CAPP 4 4 4 4 4 ': 4 4 4 4 4�:% '�: 4 4 4 <br /> 2 2 2 2�`� 2 2 2 2 2 �i:i ::�: 2 ... . <br /> LAB 1 1 1 1 1 :i�-,:i. 1 1 1 1 1 :�. ,. ........... . . <br /> 1 OF 1 Jy <br />