My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. For Shop Drawing submittals, Contractor's certification that the submittal has been <br /> coordinated and reviewed for compliance with the requirements of the Contract <br /> Documents and is approved for Architect's action. <br /> D. Submittal Transmittal: Contractor shall include a transmittal with each submittal package. <br /> Transmittal shall be directed to the Architect with a copy to the Owner's Representative. <br /> 1. Address no more than one topic, or related topics, on a single transmittal (i.e., <br /> mechanical items shall not be submitted with electrical items; miscellaneous <br /> specialties shall not be grouped; shoring shall be submitted separate from <br /> foundations). <br /> 2. Record relevant information including, but not limited to: the requested review return <br /> date (in order to maintain the construction Progress Schedule) and, for Shop <br /> Drawings, variations from the requirements of the Contract Documents. <br /> 3. Provide the minimum number of each required submittal as noted in the Contract <br /> Documents and/or as follows: <br /> a. Shop Drawings: one (1) PDF and one (1) hard copy. <br /> b. Product data: one (1) PDF and one (1) hard copy. <br /> c. Samples: three (3) samples. <br /> d. Mock ups: As required by the Contract Documents. <br /> e. Reference the Contract Documents for additional submittal requirements. <br /> 4. Material and Color Samples: Submit samples of actual materials and colors. <br /> a. Where variation in color, pattern, texture or other characteristics are inherent in the <br /> material, submit no less than three (3) variations of each sample to show <br /> approximate limits of the variations. <br /> E. Portable Document Format (PDF) Requirements: <br /> 1. All documents are to be created as PDF files from the original source files, unless <br /> approved otherwise in writing by the Owner. <br /> 2. The CAD printer shall be Autodesk DWG to PDF.pc3 print configuration. <br /> a. Layer information shall not be included. <br /> b. Revit and/or Bluebeam software may be used to create PDF files. <br /> 3. All documents are to be created with a resolution of not less than 300 dpi. <br /> 4. All fonts are to be embedded in the PDF. <br /> 5. When compression is used, the algorithm must be LZW, CITT Group 4, or PackBits. <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 0133 00 <br /> Improvements 01 33 00-2 Submittal Procedures GCCM BIM <br /> RFFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.