My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
constructability review and recommendations, value engineering review and <br /> recommendations, cost estimating and reconciliation, schedule preparation, <br /> recommendations on early procurement and early bid packages, and other pre- <br /> construction-related tasks. <br /> • Engaged on a part-time basis during the pre-construction phase. <br /> Project Manager: <br /> • The primary point of contact between the Owner,design team, and Contractor's team <br /> during the construction phase. <br /> • Has a preferred minimum of ten (10) years of experience on Projects of similar size <br /> and scope. <br /> • Has successfully completed at least two GC/CM Projects as a Project Manager of <br /> comparable size and scope. <br /> • Shall have the full authority to act on behalf of the Contractor to negotiate contract <br /> terms, execute agreements and supervise all Contractor staff, subcontractors, and <br /> materials suppliers. <br /> • May also serve as the Preconstruction Manager if this individual meets the <br /> requirements identified above for Preconstruction Manager. <br /> • Engaged on a part-time basis during pre-construction and on a full-time basis and <br /> fully dedicated to the Project with no other work commitments during the construction <br /> phase. <br /> Outreach and Inclusion Coordinator: <br /> • Primary responsibility for developing and implementing the GC/CMs outreach and <br /> inclusion plan for DBEs and SBEs as sub-consultants,subcontractors, and suppliers. <br /> Will also be responsible for developing a DBE and SBE utilization tracking and <br /> reporting system for the Project. <br /> • Has a preferred minimum of four (4) years of experience as an Inclusion and <br /> Outreach Coordinator. <br /> • Has successfully been involved in at least one (1) Project of similar size and scope <br /> utilizing the GC/CM Project delivery method. <br /> • Engaged on a part-time basis during pre-construction and construction. <br /> Project Superintendent: <br /> • Primary manager on the job site and responsible for day-to-day supervision and <br /> direction of in-the-field construction operations. <br /> • Has a preferred minimum of eight (8) years of experience on Projects of similar size <br /> and scope. <br /> • Has successfully completed at least one Project of similar size and scope, acting as <br /> Project Superintendent, utilizing the GC/CM Project delivery method. <br /> • Must have the full authority to schedule, coordinate and direct the progress of work <br /> on the site. <br /> • Must contribute to the Project planning on a part-time basis during the pre- <br /> construction phase. <br /> • Engaged on a full-time basis and fully dedicated to the Project with no other Project <br /> commitments during the construction phase. <br /> City of Everett <br /> Everett Municipal Building <br /> Public Works Tenant Improvements 11 <br /> RFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.