My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Adherence to program, budget, and schedule. <br /> 5.11 Reference Checks: <br /> The Owner reserves the right to conduct reference checks during the review and scoring of the <br /> RFP Proposals. If the information obtained from the reference checks reveals concerns about <br /> a firm's past performance or their ability to successfully perform the contract to be executed <br /> based on this RFP,the Owner may,at its sole discretion,determine that the firm is not qualified <br /> and may disqualify the firm from further consideration. In conducting reference checks, the <br /> Owner may include itself as a reference if the firm has performed past work for the Owner, <br /> even if the firm did not identify the Owner as a reference. Likewise, the Owner reserves the <br /> right to check references from other clients of the firm even if they were not identified by the <br /> firm as references in the submitted RFP Proposal. A"fail" on this reference criterion will result <br /> in that firm's RFP Proposal score being automatically reduced to"0 points". <br /> 5.12 Accident Prevention Plan: <br /> Submit a copy of the GC/CM firm's Accident Prevention Plan, as required by RCW <br /> 39.10.360(2)(c),for review and reference. Submittal of the Accident Prevention Plan will result <br /> in a "pass" for this criterion. Failure to submit an Accident Prevention Plan will result in a "fail" <br /> for this criterion. A "fail" on this criterion will result in that firm's RFP Proposal score being <br /> automatically reduced to "0 points". <br /> 6.0 INTERVIEWS <br /> GC/CM firms that submitted an RFP Proposal and are among the highest scoring from the RFP <br /> stage will be short-listed for an Interview and further evaluation by the Selection Committee using <br /> a structured and scored Interview process. Upon completion of the Interview process, highly- <br /> qualified candidates will be identified and selected as Finalists. <br /> 7.0 RFFP FINAL PROPOSALS <br /> Finalists will be invited to submit an RFFP Final Proposal in response to the Request for Final <br /> Proposal (RFFP). The RFFP Final Proposal shall include a total cost for the Specified General <br /> Conditions (SGCs) and an amount for the "GC/CM Fee" expressed as a percentage of the <br /> estimated GC/CM MACC identified for the Project. The terms "GC/CM Fee" and "Specified <br /> General Conditions"will be defined in the RFFP and the GC/CM Contract documents. <br /> The GC/CM Fee shall be stated as a percentage, which will be multiplied by the estimated <br /> GC/CM MACC to determine a single, lump-sum dollar amount of the GC/CM Fee. The lump- <br /> sum dollar amount of the GC/CM Fee will be added to the total dollar amount for the Specified <br /> General Conditions to determine a single amount that will constitute the total "Final Proposal <br /> Bid"for the Project. <br /> 8.0 EVALUATION CRITERIA AND SCORING <br /> A selection committee will review the RFP Proposals and RFFP Final Proposals received by the <br /> Owner. The evaluation criteria have been assigned the following points: <br /> 8.1 RFP Proposal <br /> City of Everett <br /> Everett Municipal Building <br /> Public Works Tenant Improvements 17 <br /> RFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.