Item/Task Document Reference Precon. Const. Specified Cost of Negotiated Const. Owner <br /> Services Cost Manager's General Work/MACC Support Manager's <br /> Fee Conditions Services Contingency ` <br /> In order to assist the GC/CM proposers in developing the cost associated with the segments of the fee proposals process and how costs are intended to be treated under the Contract Documents,the Owner is providing the <br /> following Cost Responsibility Matrix(CRM).The shaded and checked box indicates in what section the Owner expects the GC/CM proposer to apply the identified costs.This list is not intended to be a complete list of activities and <br /> costs required to complete the project,but a guide outline.Proposers should refer to the Request for Final Proposals(RFFP)along with the Contract Documents(Agreement&General Conditions),including all addenda,to <br /> ascertain all of the full project scope requirements.In the event there is conflict or omitted items contained in the CRM,the Contract Documents shall govern.Note that there are some items listed in the CRM that are not <br /> specifically addressed in the RFFP or Contract Documents but have been added to this CRM to clarify scope.These clarified scope items shall be included in the scope of services. <br /> All costs related to project record documents. N/A X <br /> Cost of the Work/MACC(Definition) A133-2.0.24 and 3.2.4.2 X <br /> Allowances for Work that is not fully defined and/or quantified at the time of A133-2.02&A201-3.8 x <br /> the GMP. <br /> Subcontractor bid document reproduction,after GMP,unless paid directly A133-7.5.4 x <br /> by Owner. <br /> Subcontractor cost(s)including labor,materials,equipment,rentals,fee, A133-7.3 X <br /> insurance,bonds etc.as allowed by the Contract Documents. — <br /> Design-build subcontractor(s)and designer(s)as required by the Contract A133-2.0.39 X <br /> Documents. <br /> Wages or salaries of GC/CM's construction workers performing construction A133-7.2.1 X <br /> of the work at the site. <br /> Personnel payroll related costs required by law or collective bargaining for <br /> taxes,insurance,contributions,assessments.For personnel not covered by X <br /> A133-7.2.4 <br /> collective bargaining,sick leave,medical and health benefits,holidays, <br /> vacation time and pensions. <br /> Cost of materials and equipment,including transportation and off-site A133-7.4.1 X <br /> storage,to be incorporated in the construction. <br /> Costs of transportation,storage,installation,dismantling,maintenance and <br /> removal of materials,supplies,temporary facilities,machinery,equipment A133-7.5.1 x <br /> and hand tools not customarily owned by construction workers that are <br /> provided by GCCM and fully consumed in performance of the work. <br /> Rental charges from a third party for temporary facilities,machinery, <br /> equipment and hand tools not customarily owned by construction workers <br /> that are provided by GCCM at the site and costs of transportation, A133-7.5.2 X <br /> installation,dismantling,minor repairs and removal of such temporary <br /> facilities,machinery,equipment and hand tools. <br /> Rentals from the GC/CM or an entity that it or any of it's owners has A133-7.5.2 X <br /> • <br /> ownership. <br /> Subcontractor cost for progress cleaning including removal of rubbish and <br /> debris from the site of the Work and its proper and legal disposal.Note that <br /> a separate,specific subcontract for progress cleaning,rubbish removal and A133-7.5.3 X <br /> debris removal not normally included in a trade subcontract is not allowed <br /> as a cost of the Work. <br /> Page 6 RHS Draft Cost Resp Matrix 12-14-21.xlsx <br />