Item/Task Document Reference Precon. Const. Specified Cost of Negotiated Const. Owner <br /> Services Cost Manager's General Work/MACC Support Manager's <br /> Fee Conditions Services Contingency <br /> In order to assist the GC/CM proposers in developing the cost associated with the segments of the fee proposals process and how costs are intended to be treated under the Contract Documents,the Owner is providing the <br /> following Cost Responsibility Matrix(CRM).The shaded and checked box indicates in what section the Owner expects the GC/CM proposer to apply the identified costs.This list is not intended to be a complete list of activities and <br /> costs required to complete the project,but a guide outline.Proposers should refer to the Request for Final Proposals(RFFP)along with the Contract Documents(Agreement&General Conditions),Including all addenda,to <br /> ascertain all of the full project scope requirements.In the event there is conflict or omitted items contained in the CRM,the Contract Documents shall govern.Note that there are some items listed in the CRM that are not <br /> specifically addressed in the RFFP or Contract Documents but have been added to this CRM to clarify scope.These clarified scope items shall be included in the scope of services. <br /> Fees of laboratories for tests required of the GCCM by the Contract A133-7.6.4 X <br /> Documents,except those related to defective or nonconforming work. <br /> Royalties and license fees paid fro the use of a particular design,process or A133-7.6.5 X <br /> product required by the contract documents. <br /> Deposits lost for causes other than the GC/CM's negligence or failure to A133-7.6.7 X <br /> fulfill a specific responsibility in the Contract Documents. <br /> Subcontractor permits,fees and licenses. A133-14.2.2.1 X <br /> Material,equipment,product and system warranties. A201-3.5 X <br /> Cutting,patching and restoration. A201-3.14 X <br /> Costs associated with uncovering work that is prematurely covered up prior <br /> to the Owner,Architect or a povernmental authority having been provide A201-12.1 X <br /> proper opportunity to inspect. --- <br /> Hazardous materials and unsuitable soils abatement,removal and disposal A201-10.3 X <br /> identified within the Contract Documents. _ <br /> Subcontractor's costs for hard-wired service connections,connection fees <br /> and monthly service charges for computers,phone,copy machines and fax N/A X <br /> machines.Note that GC/CM's costs for these items shall be included in the <br /> Specified General Conditions. <br /> Costs for Subcontractor's electronic equipment and software,including <br /> computers,copy machines,printers,scanners,plotters and fax machines and Spec Section 0150 00-1.6.L <br /> the related connection and useage costs. <br /> Subcontractor costs for preparing,submitting and approval of submittals <br /> including,but not limited to,product data,samples,mockups,shop Spec Section 0133 00-1.3 X <br /> drawings,layout drawings required by specification divisions 02-49. <br /> Protection of building products subject to damage,under cover in a clean <br /> and weather-tight enclosure,with ventilation adequate to prevent Spec Section 0150 00-1.2G X <br /> condensation and maintain temperature and humidity within range required <br /> by manufacturer's instructions. <br /> Construction waste including on-site containers for waste and recycling as Spec Section 0150 00-1.3.D <br /> well as related collection and/or disposal costs. <br /> All costs associated with equipment and utility shutdowns,including costs <br /> for associated overtime work,schedule changes or failure to complete utility Spec Section 0150 00-1.5.8.7 X <br /> connections within authorized shutdown periods. <br /> Page 7 RHS Draft Cost Resp Matrix 12-14-21.xlsx <br />