Laserfiche WebLink
• <br /> this work, which is not correct. The garage, and the "other building" for each of the two <br /> structures to remain, should be shown in both sets of drawings and specified for <br /> demolition. The demolition of the infill garage should be shown in the Existing/Demo plans <br /> for each building. Both sets should specify the "other building" to remain as being addressed <br /> in a separate permit. Work on the building addressed by each permit to fix the exterior and <br /> other impacts by removing the infill structure should be included in the associated permit for <br /> each building. <br /> The set of Plans I submitted have the same Site Plan that specifies that an attached garage was demolished. I can add a <br /> separate page for the attached garage demolition. I will make notes on how the units are being processed through <br /> different permits <br /> 1. The proposed garage is proposed to be converted to a dwelling unit. Please note that while <br /> this is considered to be an ADU per the Planning codes, the building is considered to be a <br /> separate single-family residence (SFR) per the 2018 IRC. Criteria for ADUs per the IRC do <br /> not apply. <br /> This unit was never a Garage, like I mentioned I followed the Snohomish Property Taxes page and labeled it Garage. Then <br /> Planning mentioned for it to become a Certified Structure, and yes I will use 2018 IRC and apply it as an SFR. <br /> 1. The conversion of the garage to a SFR is a change in the use. The construction drawings <br /> are required to show all existing construction and verify that it complies with the building <br /> code requirements for new construction. Where the existing construction does not satisfy <br /> the requirements for new construction, the structure must be modified. <br /> There's no change in use I submitted a Non compliance Certification to keep the current use with Planning <br /> 1. The non-structural drawings have been prepared using the 2015 IBC. The documents <br /> should be revised to comply with the requirements of the 2018 IBC. <br /> I will Review and check that everything complies with IRC 2018. <br /> 1. The floor plans should clearly distinguish between the Existing/Demo and Proposed Floor <br /> plans for each building. Currently, all sheets state "Floor Plans". <br /> 2. <br /> I will review and make necessary changes. <br /> 1. The drawings scales appear to have errors and should be revised. For example, the scales <br /> 9 PP p <br /> on Sheet A.501 appear to be '/2", not 3/" as stated. <br /> I will review and make necessary changes <br /> 1. The drawings include conversion of the storage room (2/A1.02) to a playroom <br /> (2/A.103). Note that per the available City of Everett and Snohomish County records, the <br /> 3/b <br />