My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9605 EVERGREEN WAY PACIFIC MARKET 2023-06-20
>
Address Records
>
EVERGREEN WAY
>
9605
>
PACIFIC MARKET
>
9605 EVERGREEN WAY PACIFIC MARKET 2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 4:15:52 PM
Creation date
6/20/2023 4:14:51 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9605
Tenant Name
PACIFIC MARKET
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s • 0 • F. <br /> D ,J.,,::,.,tL:j if..7;id V/./ II;i p <br /> Li MAR 3 0 2020' ` <br /> March 26, 2020 <br /> Ci i \fl OF FVFRETF <br /> RE: Owner: LJR Plaza LLC Per m it ,.)f;$ o e <br /> Job Address: 9605 Evergreen Way <br /> Plan Check Number: BW2001-004, First Building Review <br /> Drew Martin, P.E., S.E. <br /> Associate Engineer/ Commercial Plans Examiner <br /> City of Everett <br /> (425)257-8813 <br /> dmartin@everettwa.gov <br /> The enclosed letter represents our responses to your permit review comments. <br /> Comments <br /> 1. Work on existing buildings should comply with the IEBC. The IEBC provides three alternative <br /> methods for performing work: the Prescriptive Compliance Method (Section 301.1.1), the Work <br /> Area Method (301.1.2), and the Performance Compliance Method (301.1.3). The method <br /> selected for the project should be specified. A statement should be provided clarifying the types <br /> of work that are included in the project (e.g., repairs, additions, change of occupancy, etc.) and <br /> referencing the appropriate IEBC sections. The comments provided herein presume the project <br /> will comply with the Work Area Method of Chapter 5. Based on a review of the construction <br /> drawings, the proposed project appears to include the following work: Level 2 Alternations <br /> (Chapter 8). Additional and alternative types of work required for the project should be identified <br /> by the designer-of-record. See IBC Section 101.4.7, and IEBC Sections 301.1 and 504. <br /> Work Area Method , Level 2 —Alterations is selected as the method for performing work. <br /> Repairs and additions are the types of work included in the project, as noted in Chapter 5 of <br /> the IEBC. <br /> 2. The south M-occupancy space in "Building B" appears to have unpermitted alterations. Existing <br /> conditions are similar to the "1995 1996 Daves Place" permit drawings available in the City of <br /> Everett records. The current plan has multiple discrepancies with the permitted <br /> drawings. Examples include removing a counter and adjacent room of unspecified use, <br /> changing the women's restroom into storage, changing the men's restroom into an apparent <br /> unisex restroom, adding an office, adding a cold storage, and other miscellaneous <br /> modifications. The construction drawings should be revised to include changes to the building <br /> layout. All changes should be shown as new construction. Details for the changes should be <br /> provided (e.g., wall construction, accessibility requirements, etc.). All work should conform to <br /> the IBC for new construction. See IEBC Section 801.3. <br /> New alteration work (those items that the City of Everett does not seem to have plans for) <br /> has been shown on the plans. A wall section for the new office space has been added to the <br /> plans. The revised unisex restroom has been updated on the plans to show its ADA <br /> components. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.