Laserfiche WebLink
w <br /> • • <br /> 112 <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> October 18, 2019 <br /> Mr. Art Skotdal <br /> Skotdal Real Estate <br /> 2707 Colby Avenue, Suite 1200 <br /> Everett, WA 98201 <br /> Email Address: art@skotdal.com <br /> RE: Owner: North County Properties,erties, LLC <br /> Job Address: 2721 Wetmore Avenue <br /> Plan Check Number: B1906-031, Second Building Review - Structural <br /> Dear Mr. Skotdal, <br /> We have reviewed the responses to the First Review letter dated August 26, 2019. Multiple <br /> comments have not been completely addressed and require additional action before a permit can <br /> be issued. Additional comments have been added based on a review of the revised construction <br /> drawings. These comments address building issues only. The comments are itemized for <br /> consistency with the original review letter. Additional revisions or additions may be required by <br /> other departments including Public Works, Planning, and Fire. <br /> Code citations provided in the following comments reference the 2015 International Building Code <br /> (IBC), the 2015 International Existing Building Code (IEBC), the 2015 International Property <br /> Maintenance Code (IPMC), the 2015 International Fire Code (IFC), the 2015 International <br /> Mechanical Code (IMC), and the 2015 International Energy Conservation (IECC), and the 2015 <br /> Washington State Energy Code (WSEC). The current IBC referenced standard for accessible design <br /> is the 2009"Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal ADA, FHA, <br /> and HUD regulations and standards, including the Fair Housing Accessibility Guidelines, may be <br /> more restrictive. References to other design standards include the current edition. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. One copy of supplemental structural calculations. <br /> The response letter to the first review generally provided insufficient responses that significantly <br /> hampered the review process. Submittal documents shall contain sufficient information and detail <br /> to review the proposed project for compliance with the adopted codes. Upon submittal of the <br /> revised documents, your application will be given priority and plan reviews will recommence. <br /> Page 1 of 11 /CP <br />