Subsurface Exploration, Geologic Hazard, and <br /> 2721 Wetmore Preliminary Geotechnical Engineering Report <br /> Everett, Washington Preliminary Design Recommendations <br /> Soil nailing reinforcement is conducted by excavating vertically from the top down in stages of <br /> approximately 4 to 6 feet. After each stage of excavation, the exposed soils along the limits of <br /> the excavation are reinforced prior to proceeding with the next stage of excavation. <br /> Construction of a soil nail wall typically involves the following major steps: <br /> 1. Drill and install perimeter face stabilization elements, if needed; <br /> 2. Excavate soil, typically a 6-foot lift, leaving a small berm in place at the excavation toe; <br /> 3. Drill for nail holes; <br /> 4. Install and grout nails; <br /> 5. Excavate out berm to form vertical cut face; <br /> 6. Place drainage mat against cut soil face and protect with plastic sheeting; <br /> 7. Place waterproofing (if specified); <br /> 8. Place reinforcements, bearing plates, and studs; <br /> 9. Apply shotcrete wall; and <br /> 10. Repeat process down to final excavation grade. <br /> Consequently, this method requires that the soil withstand short-term, temporary vertical cuts <br /> of approximately 6 feet without caving. The glacially consolidated sediments that were <br /> encountered in our exploration borings are suitable for this type of construction, provided they <br /> remain unsaturated. As previously discussed, localized groundwater seepage was encountered <br /> within the advance outwash underlying the site and similar localized areas of seepage may also <br /> be encountered within the lodgement till. Control of this seepage is vital to the success of soil <br /> nail shoring for this project. The sand must be maintained in a dewatered condition to safely <br /> achieve the vertical cuts required for soil nail wall construction. We anticipate that the soils <br /> below minor seepage zones, if present, will generally remain standing over the required cut <br /> height, but some sloughing or piping should be anticipated. <br /> Open cuts should not be allowed to stand unshored for more than 3 days. This time could be <br /> less if zones of fractured or slickensided soil or groundwater seepage are encountered. <br /> Open-face cuts should not be left open over weekends or holidays. After applying the first lift <br /> of shotcrete, the next lift can be built after 4 days or once the shotcrete has attained 50 percent <br /> of its design strength. The project shoring designer should verify this recommended interval <br /> between lifts and provide additional or alternative recommendations, if necessary. <br /> A series of load tests must be performed to verify the design and ultimate skin friction or <br /> adhesion of the soil nails. Two types of testing should be accomplished for soil nailing. <br /> An initial verification test program is performed prior to wall construction to verify that the <br /> design adhesion values are correct. Common verification testing programs consist of at least <br /> two 200-percent tests of the design or allowable load in the soil for each excavation wall. <br /> Verification testing is usually accomplished by loading each nail in 25-percent increments held <br /> for 5 minutes up to the final load of 200-percent design load. Creep measurements are <br /> May 28, 2019 ASSOCIATED EARTH SCIENCES,INC. <br /> FSM/Id-190168E001-2-Projects‘20190168\KE\WP Page 14 <br /> 18185E Page 9 of 180 <br />