My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2700 34TH ST 2023-06-23
>
Address Records
>
34TH ST
>
2700
>
2700 34TH ST 2023-06-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 3:56:17 PM
Creation date
6/23/2023 3:55:23 PM
Metadata
Fields
Template:
Address Document
Street Name
34TH ST
Street Number
2700
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> List and Describe BMPs: <br /> BMP C233: Silt Fence <br /> Installation Schedules:Prior to the start of work. <br /> Inspection and Maintenance Plan: Silt fence will be inspected daily to verify compliance <br /> with BMP specifications. <br /> Responsible Staff: The contractor will be responsible for the installation,inspection, and <br /> maintenance of the silt fence. <br /> 2.4 ELEMENT 4: INSTALL SEDIMENT CONTROLS <br /> A silt fence will be installed around the perimeter of the site to mitigate any sediment <br /> transport. <br /> List and Describe BMPs: <br /> BMP C233: Silt Fence <br /> Installation Schedules:Prior to the start of work. <br /> Inspection and Maintenance Plan: Silt fence will be inspected daily to verify compliance <br /> with BMP specifications. <br /> Responsible Staff: The contractor will be responsible for the installation,inspection,and <br /> maintenance of the silt fence. <br /> 2.5 ELEMENT 5: STABILIZE SOILS <br /> Due to the limited duration of the project, and the intended operational dates(dry season), <br /> the project schedule intends for continual work in all areas of exposed soil. In the event <br /> that exposed soil is left unworked,it will be covered if it is to be left uncovered for 7 days <br /> (through Sep. 30)or 2 days(After Oct. 1). Stock piles will be covered as required. <br /> Excavation will be limited to the minimum extent necessary to achieve the project goals: <br /> removal of contaminated soil.To the extent possible,each excavation area will be <br /> worked until completed.No steep slopes will be impacted for this work. <br /> List and Describe BMPs: <br /> BMP C123: Plastic Sheeting <br /> Installation Schedules:As required. <br /> Inspection and Maintenance Plan: If installed,plastic covering will be inspected daily <br /> when in use to verify that it is in compliance with BMP C123:Plastic Covering. If <br /> damaged,plastic covering will be replaced. <br /> EVERETT STEEL SWPPP <br /> AUGUST 2019 1,gG <br />
The URL can be used to link to this page
Your browser does not support the video tag.