My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2700 34TH ST 2023-06-23
>
Address Records
>
34TH ST
>
2700
>
2700 34TH ST 2023-06-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 3:56:17 PM
Creation date
6/23/2023 3:55:23 PM
Metadata
Fields
Template:
Address Document
Street Name
34TH ST
Street Number
2700
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responsible Staff: The contractor will be responsible for the installation,inspection,and <br /> maintenance of plastic covering,if installed. <br /> 2.6 ELEMENT 6: PROTECT SLOPES <br /> No steep slopes exist in the vicinity of this site. <br /> 2.7 ELEMENT 7: PROTECT DRAIN INLETS <br /> To the extent possible,construction stormwater will not be allowed to enter the <br /> stormwater infrastructure near to the site.BMP C220: Storm Drain Inlet Protection will <br /> be installed in the catch basins adjacent to the project on 34th Street within 150 feet. <br /> List and Describe BMPs: <br /> BMP C220: Storm Drain Inlet Protection <br /> Installation Schedules: Prior to the start of work <br /> Inspection and Maintenance Plan: Catch basin inserts will be maintained as <br /> recommended by the manufacturer and inspected daily to verify compliance with BMP <br /> C220: Storm Drain Inlet Protection,free of physical damage and not impacted with <br /> sediment. <br /> Responsible Staff: The contractor will be responsible for the installation,inspection, and <br /> maintenance of BMP C220: Storm Drain Inlet Protection. <br /> 2.8 ELEMENT 8: STABILIZE CHANNELS AND OUTLETS <br /> There are not any existing channels on the site,and due to the flat topography and high <br /> infiltration capacity there is not expected to be surface water flow off the site.Any <br /> surface water that does not infiltrate and has the potential to migrate off the property will <br /> be pumped and stored in temporary storage tanks for either off-site disposal or approved <br /> and permitted treatment and discharge to sewer system if allowed.A silt fence that will <br /> be installed around the perimeter of the site will serve as a backup to slow and disperse <br /> any incidental surface water flow. These measures will prevent the formation of any <br /> channels. <br /> List and Describe BMPs: <br /> BMP C233: Silt Fence <br /> Installation Schedules:Prior to the start of work <br /> Inspection and Maintenance Plan: Silt fence will be inspected daily to verify compliance <br /> with BMP specifications. <br /> EVERETT STEEL SWPPP <br /> AUGUST 2019 PgG <br />
The URL can be used to link to this page
Your browser does not support the video tag.