Laserfiche WebLink
• • <br /> /The architectural drawings should include a schedule listing the selected energy credits for the <br /> proposed project and include the following: Energy calculation form has been added to plan set also <br /> see sheett 5 for prescriptive energy notes. <br /> i . See selected energy credit option 2.2. To qualify to claim this credit, the building permit <br /> drawings should specify the option being selected and should specify the maximum tested building air <br /> leakage and shall show the heat recovery ventilation system. Energy calculation form has been added <br /> to plan set also see sheet A5 for prescriptive energy notes. <br /> /See selected energy credit option 3.5. To qualify to claim this credit, the building permit <br /> drawings should specify the option being selected and should specify the heating equipment type and <br /> the minimum equipment efficiency. Equipment and material guidelines are included in the plan set <br /> thru the calculation form and notes on sheet A5 to meet the energy code credits. Mechanical, <br /> electrical and plumbing are bidder design and will be provided to meet the requirements, makes and <br /> models are not available at this time but the requirements are listed and will be meet. Just as <br /> insulation requirements/sizes are called out but not a specific brand. <br /> /See selected energy credit option 5.3. To qualify to claim this credit, the building permit <br /> drawings should specify the option being selected and should specify the water heater equipment <br /> type and t e minimum equipment efficiency. See above response to Architectural 3 b. <br /> ee selected energy credit option 7.1. To qualify to claim this credit, the building permit <br /> drawings should specify the option being selected and should show the appliance type with Energy <br /> Star compliance. See above response to Architectural 3 b. <br /> A(See Engineered Notes Sheet. Part Two Insulation and Windows of the Prescriptive Residential <br /> Energy Code Plan General Notes should be updated to match the modification requirements in the <br /> selected energy credits option 1.3. For example, the floor insulation should be R38. Energy <br /> information on General notes sheet has been updated. Energy calculation form has been added to <br /> plan set also see sheet A5 for prescriptive energy notes. <br /> Continuing from the previous comment, Table 6-1 is referenced but this table is not in the current <br /> 2018 WSEC. Energy information on General notes sheet has been updated. Energy calculation form <br /> has been added to plan set also see sheet A5 for prescriptive energy notes. <br /> engineered notes should be updated to remove the retaining wall schedule and Portal Frame Detail <br /> as they do not apply to this project. R106.1.1 See updated Sheet A5 <br /> Structural <br /> /I. Plans should include a note to specify all wood in contact with concrete to be pressure treated or of <br /> natural resistance to decay. Section R317 See note#14 Foundation and Main floor framing notes <br /> Sheet Si <br /> ,Yee Detail 2/S2. Detail should specify minimum distance from the exposed ground to framing <br /> members above. Note that wood joists or the bottom of a wood structural floor where closer than 18 <br /> inches or wood girders where closer than 12 inches to the exposed ground are to be pressure treated. <br /> R317.1 See note#14 Foundation and Main floor framing notes Sheet S1 and revised detail. <br /> !See Detail 2/S3. Plans should provide railing post spacing. R106.1.1. Noted added to detail" See <br /> plan for specific spacing. <br /> /See Sheet S-2. Upper Floor Framing Plan is unclear on what is being restored. The upper floor <br /> framing above the shop is not provided. Plans should clearly indicate and show what framing is being <br /> replaced and what is to remain. See General Comment 1 for additional information. R106.1.1 <br /> Additional plan notes and wall key have been added to define areas of work. <br />