Laserfiche WebLink
2018 WSEC Requirements for Commercial Buildings including Group R2, R3 & R4 over 3 stories & all R1 -- 111111111' inistered by @2022 NEEA, All rights reserved <br />The following information is necessary to check a permit application for compliance with the lighting systems, motors and electrical system requirements in the <br />Washington State Energy Code, Commercial Provisions. <br />For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br />NA <br />C408.1.2 <br />Commissioning Include general summary of Cx plan per <br />the contractor will <br />C408.1.2.1 <br />requirements in C408.1.2 including: 1) Narrative description <br />provide this if <br />C408.1.4 <br />construction of activities; 2) Responsibilities of the Cx <br />required <br />C103.6.3 <br />documents team; 3) Schedule of activities including <br />verification of project close out <br />documentation per C 103.6; 4) Conflict of <br />C408.1.2 <br />interest plan (if required) <br />NA <br />Commissioning Include in general summary that a Cx project the contractor will <br />C408.1.4 <br />requirements in report and Compliance Checklist (Figure provide this if <br />C103.6.3 <br />construction C408.1.4.1) shall be completed by the required <br />documents Certified Cx Professional and provided to the <br />owner prior to the final electrical inspection <br />Functional I Identify in plans and specifications the the contractor will <br />NA <br />C408.4.1 <br />performance testing intended operation of all equipment and provide this if <br />criteria controls during all modes of operation, required <br />including interfacing between new and <br />existing -to -remain systems <br />PROJECT CLOSE OUT DOCUMENTATION <br />i- <br />NA C103.6.3 Project close out Indicate in plans that project close out I the contractor will <br />documentation documentation is required including WSEC provide this if <br />requirements lighting compliance reports that document all required <br />interior and exterior lighting area and / or <br />surface types, lighting power allowances and <br />installed densities <br />If "no" is selected for any question, provide explanation. <br />Page 10/10 <br />