Laserfiche WebLink
to the range location. e new owners wish to remove all gas appliances from <br /> their house and to only have electric. So all gas lines added at any point will b e <br /> removed and capped.All new appliances electrical wi be addressed in the <br /> electrical permit. <br /> • Electrical, mechanical, andTh plumbing modifications expectedll to have occurred. <br /> There have been electrical, mechanical and plumbing modifications. These will all <br /> be addressed and remedied either in our submitted building plans or in each <br /> trade's respective permit and plans.All areas in questions will be opened and <br /> exposed for any inspections. <br /> • House may have been reroof based on comparison of Google and Redfin photos. <br /> While the roof does look like it is recent and in good condition, I am unaware of <br /> the actual age of the roof or a date for any re-roof job/project. Some roof repair will <br /> be involved in the project after the removal of the fireplace/chimney. If an <br /> inspection determines that the roof is new or requires any additional <br /> modifications or fees, we will comply with what is then required. <br /> • Replaced exterior wood deck guards with glazed guards. <br /> All deck guards look to be installed according to code.We will have our engineer <br /> look at the deck guard specifications and determine if they meet the standards. If <br /> it is determined by the engineer or an inspection that the guards are not up to <br /> code, we will remedy as needed. Current guards are very similar to other existing <br /> guards in the neighborhood. <br /> • Replacement of asphalt driveway with concrete driveway. <br /> While the driveway does look like it is newer and in good condition, I am unaware <br /> of the actual age of the driveway or a date for any such project. If an inspection <br /> determines that the driveway is new or requires any additional modifications or <br /> fees, we will comply with what is then required. <br /> 8/3 <br />