Laserfiche WebLink
• <br /> ' ' II <br /> C <br /> Gathered Ho <br /> Plan CheckharlieApel Numuse <br /> ber: B2106-064, First Building Review <br /> November 1, 2021 <br /> 8. Continuing with the previous comment, calculations should be submitted for review of the <br /> existing 2x ridge board. It appears the 2x ridge board is spanning 60 inches due to the spacing <br /> of the bracing. <br /> 9. See Sheet S-5. Plans should provide a detail for Beam RB-3. The notes on the plans are not <br /> clear. R106.1.1 <br /> 10. See Sheet S-2 and structural calculations. Structural calculations show several beams and <br /> supporting posts with large reactions. Calculations should be provided showing that the existing <br /> footings are adequate for the reactions. Note that some supports are spaced close and should <br /> be taken into consideration for example, supports for Beam RB-1, FB-2, and FB-4. <br /> 11. See Sheet S-2 and S-3. It appears that (2) shear walls are being added to the first floor. Plans <br /> should include a footing/support below these walls. <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with <br /> the laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Rakeeb Khan <br /> Residential Plans Examiner <br /> (425)257-7299 <br /> rkhan@everettwa.gov <br /> S:\RKhan\2021\B2106-064_R1.docx <br /> O3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> Everett, WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 5 of 5 <br />