My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 75TH ST SW SNO CO PUD 2023-08-08
>
Address Records
>
75TH ST SW
>
1122
>
SNO CO PUD
>
1122 75TH ST SW SNO CO PUD 2023-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:58:06 PM
Creation date
7/31/2023 3:45:32 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1122
Tenant Name
SNO CO PUD
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />From: Curfman, Mark <MTCurfman@Snopud.com> <br />Sent: Monday, August 8, 2022 4:13 PM <br />To: Sandra Higgins <Sandra@caparchgroup.com>; Tom Griffin <Tom @capa rchgrou p.com> <br />Subject: FW: B2204-038 Follow-up Comments <br />Sandra and Tom, <br />Please forward this on to CG Engineers to help with the response to these comments. <br />Thanks, <br />Mark T. Curfman, AIA <br />Principal Architect <br />Facilities Planning + Engineering <br />Snohomish County PUD <br />p. 425.783.8004 <br />c. 425.308.2826 <br />e. MTCurfman@snopud.com <br />James, <br />Attached are supplemental information and responses to your comments. In addition to the structural comments, we <br />will be adding signage to the meter storage area regarding stacking pallets two -high maximum and that only one pallet <br />can be transported at a time with a pallet jack. <br />I trust that this answers your questions. If not, please contact me. <br />Thanks, <br />Mark T. Curfman, AIA <br />Principal Architect <br />Facilities Planning + Engineering <br />Snohomish County PUD <br />p. 425.783.8004 <br />c. 425.308.2826 <br />e. MTCurfman@00o 0d corm X;. <br />f <br />From: James Bronder <JBronder@everettwa.gov> <br />Sent: Monday, AugusT48, 20.2212,2413M <br />To: Curfman, Mark <MTCurfman@Snopud.com> <br />Subject: B2204-038 Follow-up Comments <br />CAUTION: THIS EMAIL IS FROM AN EXTERNAL SENDER. <br />Do not click on links or open attachments if the sender is unknown or the email is suspect. <br />Hi Mark, <br />I have some follow-up questions that would involve structural providing clarification. <br />1. On Sheet S2.1 of the plan set, there is a note of 125 psf Live Load (LL) to the south of the building. The same <br />hatch markings are also shown to the north of the building. Is the 125 psf LL intended to match in the north and <br />south portions given the same hatch area indicated? Currently, the northern portion of the building indicates a <br />100 psf LL. Should this northern portion also be shown as 125 psf LL? Please clarify. <br />2 /3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.