My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 47 <br /> I <br /> Conditions relating to the Contract Claim. Adjustments to Contract Time shall be determined pursuant to <br /> I 5.2.2.2 Extensions of Contract Time. Failure to comply strictly and timely shall be deemed a waiver of <br /> the Contract Claim. <br /> 12.4.2 Extra Work <br /> I12.4.2.1 Adjustment of Contract Sum <br /> If the Contractor is entitled to an adjustment of Contract Sum because of Extra Work,the adjustment shall <br /> be calculated and paid as provided in 9.5.ADJUSTMENT OF CONTRACT SUM. This amount <br /> I includes jobsite and home office Overheads for such Work,including any schedule delays relating to such <br /> Work. Therefore,no compensation in addition to that provided in 9.6.FORCE ACCOUNT shall be <br /> paid for such things as extended Overhead or other costs or damages. <br /> I12.4.2.2 Extension of Contract Time <br /> Extensions of Contract Time caused by Extra Work shall be determined as provided in 5.2.2.2 <br /> Extensions of Contract Time. <br /> I12.4.3 Delays <br /> 12.4.3. Owner Caused Delay Unrelated to Extra Work <br /> I 12.4.3.1.1 Adjustment of Contract Sum <br /> If the Contractor is entitled to an adjustment of Contract Sum because of a Delay solely caused by the <br /> Owner that does not relate to Extra Work, Contractor shall only be compensated for the items below, <br /> 111 less all funds paid pursuant to any change in the Contract Sum that contributed to the Delay: <br /> 1. Documented, incurred cost of nonproductive field supervision or labor extended because of the <br /> Delay; <br /> I2. Documented,incurred cost of home office supervision to attend jobsite meetings; <br /> 3. Documented, incurred cost of temporary facilities or equipment rental extended because of the <br /> Delay; <br /> I4. Documented, incurred cost of insurance extended because of the Delay; <br /> 5. General and administrative Overhead in an amount to be agreed upon,but not to exceed three <br /> I percent(3%) of original Contract Sum divided by the Contract Time for each day of the Delay. <br /> Owner shall not owe Contractor compensation for extended Overhead or other delay costs to the <br /> extent Contractor or anyone other than the City contributed to or is concurrently responsible for the <br /> I Delay. <br /> 12.4.3.1.2 Adjustment of Contract Time <br /> If the Contractor is entitled to an adjustment of Contract Time because of a Delay solely caused by <br /> I the Owner that does not relate to Extra Work,Contractor shall be entitled to an adjustment of <br /> Contract Time to the extent the Delay increases the duration of the Project, as measured by the critical <br /> path and as demonstrated pursuant to the requirements of 5.2.2.2 Extensions of Contract Time. <br /> I 12.4.3.2 Contractor Caused Delay <br /> If the Contractor is solely responsible for any Delay to any interim milestone, Substantial Completion, <br /> Physical Completion or the Completion Date,the Owner shall be entitled to liquidated or other damages <br /> as provided elsewhere in the Contract Documents. The Contractor accepts the risk of any Delays caused <br /> by strikes,work slowdowns,job actions and labor unrest of any kind. Contractor shall not be entitled to <br /> any increase in Contract Sum or Contract Time due to a Delay it caused. <br /> I 12.4.3.3 Delays Concurrently Caused by Contractor and Owner <br /> If the Owner and the Contractor cause a Delay concurrently,neither the Owner nor the Contractor shall be <br /> liable to the other except as provided herein. <br /> I <br /> 00 72 00 - 47 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.