My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 01 25 00 -4 <br /> concerning "substitutions"for the selection of a matching product in another <br /> product category. <br /> 7. VISUAL SELECTION: Where specified product requirements include the phrase <br /> "...as selected from the manufacturer's standard colors, patterns, textures..." or <br /> similar phrases, select a product and manufacturer that complies with other <br /> specified requirements. Architect will select the color, patterns and texture from <br /> the product line selected. <br /> 1.7 SUBSTITUTIONS ' <br /> A. GENERAL: If the Contractor desires approval of some material or product other than <br /> that specified, he may submit a written request for approval of the substitute item in <br /> accordance with the following requirements. <br /> 1. All such requests shall be submitted in four (4) copies and must be made on the <br /> "Substitution Request Form", see Section 006325 Substitution Request Form. <br /> 2. No request for approval will be considered unless submitted in accordance with <br /> this Section. <br /> 3. Final decision as to whether an item is an equal or satisfactory substitution rests <br /> with the Owner. <br /> B. REQUESTS FOR APPROVAL: Every request for approval must state whether the item <br /> offered is an equal or q better substitution. Each request for substitution must be <br /> referenced to the related specification section and drawing numbers, and be complete <br /> with product data/drawings, description of methods, technical and other information. If <br /> applicable, include samples showing comparison or physical and other pertinent <br /> characteristics as required to establish equivalence of acceptability for the proposed <br /> application. Where specific a test results are required by the contract documents, the <br /> comparison data for the proposed item shall be based upon the same test methods as <br /> those specified, or they shall be correlated to clearly demonstrate comparability. The <br /> same warranty described for the specified product is required for the substitution. <br /> C. DURING BID PERIOD: Request for substitutions will not be considered during the bid ' <br /> period. <br /> D. AFTER RECEIPT OF BID: Requests for approval of alternative materials or products <br /> will be considered by the Owner for a period of sixty(60) calendar days following date of <br /> "Notice To Proceed". Within ten (10) calendar days of receipt of Contractor's request for <br /> substitution, the Owner will request whatever additional information or documentation <br /> may be needed for his evaluation of the request. Within twenty (20) calendar days of <br /> receipt of request, or within one week of receipt of requested additional information or <br /> documentation (whichever is later), the Owner will notify the Contractor of either his <br /> acceptance or his rejection of the proposed substitution. In submitting a request for <br /> substitution, the Contractor agrees to the following: <br /> 1. That the Contractor has personally investigated the proposed substitute product or <br /> material and determined that it is equal or superior in all respects to that specified. <br /> 2. That the Contractor shall provide the same warranty for the substitution as he <br /> would for that specified. <br /> 3. That the Contractor will coordinate all trades, including changes thereto as may be <br /> required, that he waives all claims for additional costs which subsequently become <br /> 01 25 00 -4 SUBSTITUTION PROCEDURES 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.