My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 01 25 00 - 5 <br /> apparent as a consequence of the substitution and that he will bear all costs related <br /> ' thereto. <br /> 4. If, in the opinion of the Owner, the proposed substitution is not equal or better in <br /> every respect to that specified, the Contractor shall furnish the specified material <br /> or product at no additional cost to the Owner. <br /> ' E. CONDITIONS: Contractor's request for substitution will be reviewed and considered <br /> except as noted when extensive revisions to contract documents are not required and <br /> ' changes are in keeping with the general intent of contract documents; when timely, fully <br /> documented and properly submitted; and when one or more of the following conditions <br /> is satisfied, all as judged by Owner. Otherwise, requests will be returned without action <br /> ' except to record non-compliance with these requirements: <br /> 1. Where request is directly related to an "or equal"clause or other language of same <br /> effect in contract documents. <br /> 2. Where required product, material or method cannot be provided within contract <br /> time, but not as a result of Contractor's failure to pursue the work promptly or <br /> coordinate various activities properly. <br /> 3. Where required product, material, or method cannot be provided in a manner <br /> ' which is compatible with other materials of the work, or cannot be properly <br /> coordinated therewith, or cannot be used without adversely affecting Owner's <br /> insurance coverage on completed work, or will encounter other substantial non- <br /> compliances which are not possible to otherwise overcome except by making <br /> requested substitution, which Contractor's thereby certifies to overcome such <br /> noncompliance, non-coordination, non-warranty, non-insurability, or other non- <br /> compliance as claimed. <br /> ' 4. Where required product, material or method cannot receive approval by a <br /> governing authority, and requested substitution can be so approved. <br /> 5. Where substantial advantage is offered Owner, in terms of cost, time or other <br /> ' valuable considerations, after deducting offsetting responsibilities Owner may be <br /> required to bear, including additional compensation to Architect for redesign and <br /> evaluation services, increased cost of other work by Owner or separate <br /> ' Contractors, and similar considerations. <br /> F. After sixty (60) calendar day period following "Notice To Proceed": Requests for <br /> approval of substitute materials will not be considered, except if one or more of the <br /> ' following conditions exists. With his request, the Contractor shall indicate which <br /> condition he believes applies. <br /> 1. UNAVAILABILITY: A substitution is required because the specified item is not <br /> ' available, due to factors beyond the control of the Contractor. <br /> 2. UNSUITABILITY: Subsequent information or changes disclose inability of the <br /> specified item to perform as intended. <br /> ' 3. REGULATORY REQUIREMENTS: Final interpretation of code, regulatory <br /> requirements, safety requirements, or insurance requirements necessitate a <br /> change due to inability of the specified item to conform. <br /> 4. WARRANTY: Manufacturer or fabricator cannot certify or warrant performance of <br /> specified item as required. <br /> 5. OWNER'S BENEFIT: In the judgment of the Architect, acceptance of the proposed <br /> substitution is clearly in the Owner's best interest because of cost, quality, or other <br /> ' consideration. In requesting a substitution under this clause, the Contractor shall <br /> furnish substantiation of any such reason. <br /> ' 01 25 00 - 5 SUBSTITUTION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.