My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Valdez Construction, Inc. 8/7/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2024
>
Valdez Construction, Inc. 8/7/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 2:06:00 PM
Creation date
8/11/2023 1:55:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Valdez Construction, Inc.
Approval Date
8/7/2023
Council Approval Date
6/28/2023
End Date
5/28/2024
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Field Installation
Public Works WO Number
PTD0465
Tracking Number
0003892
Total Compensation
$3,548,359.98
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Inductive Charging Infrastructure for Field Installation 01 25 00 - 6 <br /> G. Substitutions will not be considered if they are indicated or implied on shop drawings or <br /> other project data submittals, without proper notice shown on Section 00 63 25. ' <br /> H. WORK-RELATED SUBMITTALS: Contractor's submittal of, and Architect's acceptance <br /> of, shop drawings, product data or samples which indicate work not complying with <br /> requirements of contract documents,does not constitute an acceptable and valid request <br /> for, nor approval of, a substitution. <br /> I. GENERAL CONDITIONS: To this extent this Section is inconsistent with Subsection 8.5 <br /> of Section 007200 General Conditions, the requirement most stringent on the Contractor <br /> governs. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 25 00 ' <br /> 1 <br /> 1 <br /> 01 25 00 - 6 SUBSTITUTION PROCEDURES ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.