My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/08/16 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/08/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 9:22:40 AM
Creation date
8/17/2023 9:19:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 16 of 27 <br /> <br />6. Non-reflective cab window glass options that provide the best visibility from inside of the cab through <br />the side windows. Current experience is that the side windows have a reflective quality reducing and <br />preventing visibility through the windows in certain light conditions. <br />7. Additional storage compartments and bins located in the cab such as overhead storage in the raised <br />roof portion. <br />8. Fuel tank capacity maximized for chosen chassis. <br />9. Diesel exhaust fluid (DEF) tank capacity maximized for chosen chassis. <br />10. Provide optional cab styles if available. <br />11. Blind spot monitoring system, preferably in or on the side mirrors. <br />12. Attachable tailboard extension or other system designed to carry rolls of 5” hose on the tailboard. <br />13. Individual flowmeters independent of the foam system’s flowmeter on the rear outlets and on the <br />1.5” outlet on the right-side pump panel. <br />14. On-spot chains. <br />15. Automatic chassis lubrication. <br />2.11 APPROVAL DRAWING <br />A drawing of the proposed apparatus must be provided for approval before construction begins. This <br />drawing must indicate the apparatus dimensions, location of the lights, siren, horns, compartments, <br />ground ladders, major components, etc. <br />Any revisions to the drawing must be tracked to show any approved changes made to the original <br />drawing. The finalized and approved drawing will incorporate all the changes and become part of the <br />contract documents. <br />2.12 PUMP PANEL DRAWING <br />A layout drawing for each pump panel with exact dimensions must be provided before construction. <br />2.13 INSPECTION CERTIFICATION & CERTIFICATE <br />To assure the vehicle is built to current NFPA standards, the apparatus, in its entirety, shall be third-party, <br />independent, audit-certified through Underwriters Laboratory (UL) that it is built and complies to all <br />applicable standards in the current edition of NFPA 1901. The certification includes: all design, <br />production, operational, and performance testing of not only the apparatus, but those components that <br />are installed on the apparatus with no exception. <br />A placard shall be affixed in the driver’s side area stating the third-party agency, the date, the standard, <br />and the certificate number of the whole vehicle audit. <br />2.14 WARRANTY <br />At a minimum, the warranty will extend one year from its first in service date.
The URL can be used to link to this page
Your browser does not support the video tag.