• • <br /> Mr. Dennis Colt <br /> Colt Builders, Inc. <br /> Plan Check Number: B2105-014, First Building Review <br /> June 4, 2021 <br /> b. Type I hoods should have a minimum clearance on all sides of 19 inches per IMC Section <br /> 507.2.6. Alternatively, adjacent construction should comply with Section 308.4.2. Where <br /> reduced clearances are provided, details for the adjacent wall and roof construction should <br /> be included in the architectural plans. <br /> c. The project appears to require at least one Type II hood at the dishwashing station. Type <br /> II hoods should be specified on the plans where required. See IMC Section 507.3. <br /> Accessibility: <br /> 7. The sinks in the work area should be accessible. The sink adjacent to the mop sink does not <br /> appear to comply. Clearances for all sinks should be shown. Pipe protection should be <br /> provided. See IBC Section 1102.1 and ICC A117.1-09 Section 606.1. <br /> 8. The project involves Level 3 Alterations to the building per IEBC Chapter 9. Accessibility <br /> improvements per IEBC Section 305.7 should be included in the project. Potentially inaccessible <br /> elements include, but are not limited to, the entryway doors, accessible route from the parking <br /> to the entryway doors, and parking including striping and signage. Where the building is made <br /> to be less than fully-accessible per one of the exceptions, documentation substantiating the <br /> limited accessibility improvements should be submitted for review. Where Exception 1 is used, <br /> the documentation should itemize the improvements and estimated cost of work associated <br /> with each item. Note that new work that does not address a previously-existing deficiencies <br /> does not qualify to satisfy this requirement. <br /> 9. The bathroom on Sheet A.2 is an accessible bathroom. Additional elevations and details for the <br /> bathroom should be provided. See IBC Section 1102.1, and references below to ICC A117.1-09 <br /> unless noted otherwise. The following comments should be addressed: <br /> a. Show accessible clearances per Sections 603, 604.3, and 606.2. <br /> b. Show centerline dimension for the water closet measured from the side wall per Section <br /> 604.2. <br /> c. Show centerline dimension for the sink measured from the side wall per IBC Section <br /> 107.2.1. <br /> d. Provide dimensions for the horizontal and vertical grab bars per Sections 604.5.1 and <br /> 604.5.2, and Figures 604.5.1 and 604.5.2. <br /> e. Provide water closet seat height dimension per Section 604.4. <br /> f. Provide a vertical grab bar on the sidewall per Figure 604.5.1. <br /> g. Provide sink pipe insulation per Section 606.6. <br /> h. Locate the water closet flush control on the open side per Section 604.6. <br /> i. Provides signage per IBC Section 1111.1. <br /> Energy: <br /> 10.The project appears to include the removal of finishes on the exterior walls. Modifications to <br /> the finishes on the underside of the roof may also be intended. Details for the replacement of <br /> finishes should be provided. The modified finished for the exterior building envelope are <br /> required to comply with the commercial energy provisions for new building per the WSEC <br /> Chapter 4. See IEBC Section 907.1. <br /> 03200 Cedar Street ® 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/p <br /> Page 3 of 4 <br />